Automaker
The automaker now produces daily 4 new cars more than last year, so the production of 360 cars will save just one full working day. How many working days to produce 360 vehicles were needed in the previous year?
Correct answer:
Tips for related online calculators
Are you looking for help with calculating roots of a quadratic equation?
Check out our ratio calculator.
Check out our ratio calculator.
You need to know the following knowledge to solve this word math problem:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Hat and scarf
Katy knitted a scarf four times faster than a hat. Knitting together lasted 15 days. How much did she knit a hat? - Two xeroxes
The performances of the two copiers are in the ratio of 3: 4. A machine with higher power will make 7,200 copies in one hour. How many copies will both machines make together in 5 hours? - Mr. Ben
Mr. Ben drives bricks to the construction site. If he drove three times a day, he would make bricks in 8 days. How many times a day would he go every day to be done two days earlier? - Everyone drinks the same
Twenty-four bricklayers drink 72 beverage bottles a day at the construction site. How many bottles would 19 bricklayers need? Everyone drinks the same. - Six workers
Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do seven workers earn in 10 days with the same daily average salary? - Five combers
Five combers harvest 12 rows of strawberries in 4 hours. How many rows of strawberries will two combers harvest in 10 hours? - Diggers
The excavation was carried out in 4 days, and five workers worked on it for 7 hours daily. Determine how long it would take to excavate if seven workers worked on it 8 hours a day. - Earnings 20763
Two workers worked on a joint task: One worked 36 hours and the other 40 hours. Earnings of 11400 are divided by the ratio of hours worked. How much did everyone get? - Worker's performance
Fifteen workers paint 180 m fence in 3 days. In how many days will nine workers paint a 360 m fence? We assume that each worker has the same, constant and unchangeable performance. - Painters
Ten painters will paint the school in 20 days. How many days do four painters paint the school at the same pace of work? - Cook on gas
The gas cylinder will last 30 weekends for 2 hours of daily cooking. How many days will we be able to cook on a new cylinder when we cook for 3 hours a day? - The work
The work was to be done by 150 workers. At the beginning of their work, The company reduced their number by 40, which increased the work time by 5 and 1/3 of the schedule. How long did work take? - Ten cashiers
Ten cashiers are open at Tesco. Customers wait an average of 15 minutes. How many other cashiers have to open to reduce the waiting time by 4 minutes? - Five mechanics
Five mechanics will make a car for some time. How many cars can 30 mechanics produce at the same time? - Hay bags
Four cows eat 16 hay bags in 5 days. How many bags will eat five cows in 7 days? - Three machines
The power of the three machines is 2: 3: 5. Two most powerful machines produce 400 parts per hour. How many components make all three machines in 3 hours? - Two diggers
Two diggers should dig a ditch. If each of them worked one-third of the time the other digger needed, they'd dig up a 13/18 ditch together. Find the ratio of the performance of these two diggers.