Greenhouses

Two workers would make installation of greenhouses for 54 hours. For how many hours does the installation 9 workers?

Result

x =  12 h

Solution:


2*54 = 9x

9x = 108

x = 12

Calculated by our simple equation calculator.








Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Next similar examples:

  1. Forestry workers
    forestry_workers In the forest is employed 43 laborers planting trees in nurseries. For 6 hour work day would end job in 35 days. After 11 days, 8 laborers go forth? How many days is needed to complete planting trees in nurseries by others, if they will work 10 hours a da
  2. Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection dig for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  3. Car
    american-cars Car goes from point A to point B at speed 86 km/h and back 53 km/h. If they goes there and back at speed 67 km/h trip would take 10 minutes shorter. What is distance between points A and B?
  4. Pizza
    pizza_2 Pizza with a diameter 50 cm have weight 559 g. What diameter will have a pizza weighing 855 g if it is make from the same cloth (same thickness....) and same decorated?
  5. Metallurgical enterprise
    iron_industry Metallurgical company daily produces 318 tons of cast iron. How many tons of coke it burns to melt cast iron when 10 tons of cast consumes 6 tons of coke?
  6. Tape
    mg Video is 153% more expensive than tape recorder. How many percent is tape recorder less expensive than video?
  7. Coke
    uhlie From one ton of coal is produced 772 kg of coke for iron production. How many wagons of coal by 13 tonnes per day is needed for the blast furnace, which has a daily consumption of 1020 tons of coke?
  8. Leveling
    quattro Calculate how many 25 kg bags of leveling concrete must be purchased if we leveling room 15 m2 to the "height" 6 mm if consumtion is 1.5 kg per square meter and millimeter thickness.
  9. ŽSR
    luzianky Calculate fixed annual personnel costs of operating monorail line 118 km long if every 5 km is station, which serve three people - one dispatcher and two switchman in 4-shift operation. Consider the average salary of the employee 885 €.
  10. Washer
    pracka Washing machine drum wash at 54 RPM. Washing machine motor pulley has diameter 5 cm. What must be the diameter of the drum machine pulley when the motor is at 301 RPM?
  11. Car range
    Lupo_3L_TDI.JPG Calculate the maximum range of car, if you can spend 10 euros, price of diesel is 1.55 Eur/l and car consumption is 3 l/100 km.
  12. Glass
    sklo At the glass shop we have to cut 8 sheets of glass. Each was shaped a square with sides of 18 cm. We paid 44 CZK. How much is a 1 m2 of glass?
  13. Tare
    camion Gross weight of shipment is 5188 kg and its tare is 5.6%. Calculate the net weight of the shipment.
  14. Medicament
    tablets Same type of medicament produces a number of manufacturers in a variety of packages with different content of active substance. Pack 1: includes 60 pills of 600 mg of active substance per pack cost 9 Eur. Pack 2: includes 150 pills of 500 mg of active sub
  15. Expression
    fractions If it is true that ? is:
  16. Wage
    socik Increasing the minimum wage while maintaining the other parameters of the system, unemployment will be:
  17. Reciprocal
    reciprocal For given real numbers, calculate reciprocal number.