Boots

Master shoemaker has three apprentices. First do one pair of boots for two days, second for 1 day, third on 1.5 day. If they worked together, for how long it would take made a couple of boots?

Result

x =  8 h

Solution:


(1/2+1/1+1.5)(x/24) = 1

3x = 24

x = 8

Calculated by our simple equation calculator.







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Need help calculate sum, simplify or multiply fractions? Try our fraction calculator. Do you have a linear equation or system of equations and looking for its solution? Or do you have quadratic equation?

Next similar examples:

  1. Novak
    novakovci Novak needed to dig up three of the same pit in the garden. The first pit dug father alone for 15 hours. His second dig son helped him and it did that in six hours. The third pit dug son himself. How long it took him?
  2. Cleaning windows
    windows Cleaning company has to wash all the windows of the school. The first day washes one-sixth of the windows of the school, the next day three more windows than the first day and the remaining 18 windows washes on the third day. Calculate how many windows ha
  3. Fractions
    zlomky_13 Three-quarters of an unknown number are 4/5. What is 5/6 of this unknown number?
  4. Pumps A and B
    pump_2 Pump A fill the tank for 12 minutes, pump B for 24 minutes. How long will take to fill the tank if he is only three minutes works A and then both pumps A and B?
  5. Working together on project
    work_10 Two employees working on the project. First make it alone for 20 days the second for 24 days. How many days will take to complete project if 5 days they work together then first will take two days holiday and after returning they completes a project toget
  6. Sprayers
    postrekovac The vineyard can be sprayed first sprayer in 5 hours and with the second in 8 hours. How long would it take if we use sprayers both at once?
  7. Two workers
    clock-night-schr_12 The first worker would himself completed the work in 8 hours, the other in 6 hours. After two hours of joint work left the first worker to a doctor and other completed work himself. How many hours worked the other worker himself?
  8. Bricklayers
    murari 8 bricklayers build a house for 630 days. How many bricklayers have to add after 150 days, so then the whole building completed in (next) 320 days?
  9. Strawberries
    strawberries Father collects strawberries himself in 4 hours, son in 14 hours. How long will it take them along when dad comes to help son collect strawberries after 3 hours?
  10. Eqn
    fractal_16 Solve equation with fractions: 2x/3-50=40+x/4
  11. Equation with x
    eq2_3 Solve the following equation: 2x- (8x + 1) - (x + 2) / 5 = 9
  12. Unknown number
    nums Identify unknown number which 1/5 is 40 greater than one tenth of that number.
  13. Pears
    hrusky_4 There were pears in the basket. I took them two fifths and left them in a basket of six. How many pears I took?
  14. Together
    workers_23 Grandfather, father, and son are carpenters. They decided to make a wardrobe. Father produces it for 12 hours, his son for 15 hours, and grandfather for 10 hours. How long will they make it together?
  15. Simple equation
    axes_1 Solve for x: 3(x + 2) = x - 18
  16. Six years
    children_9 In six years Jan will be twice as old as he was six years ago. How old is he?
  17. Unknown number
    fractions_6 I think the number - its sixth is 3 smaller than its third.