Pipes

Water pipe has a cross-section 1405 cm2. An hour has passed 756 m3 of water. How much water flows through the pipe with cross-section 300 cm2 per 15 hours if water flow same speed?

Result

V2 =  2421.4 m3

Solution:

Solution in text V__2 =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Tip: Our volume units converter will help you with converion of volume units. Do you want to convert area units?

Next similar examples:

  1. Pool
    pool If water flows into the pool by two inlets, fill the whole for 18 hours. First inlet filled pool 10 hour longer than second. How long pool is filled with two inlets separately?
  2. Water reservoir
    nadrz_3 The water reservoir is filled with one pump for 4 days by the second one for 9 days. Outlet can drain tank in 12 days. How long take fill the reservoir if both pumps are running and not closed outlet channel.
  3. Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection dig for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  4. Tank No 8
    tank1 Tank is filled by one inlet valve with a flow rate of 12 liters per second in 72 minutes. How long take the tank to fill, if we open half an hour after one more inlet?
  5. Forestry workers
    forestry_workers In the forest is employed 43 laborers planting trees in nurseries. For 6 hour work day would end job in 35 days. After 11 days, 8 laborers go forth? How many days is needed to complete planting trees in nurseries by others, if they will work 10 hours a da
  6. Tractors
    tractors Fields go plow two tractors with various performance. The first tractor plow whole field in 20 hours, the second tractor plow whole field 30 hours déle. How long take plow whole field with two tractors?
  7. Road repair
    workers_1 Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair same road 37 workers if they work 8 per day?
  8. Pumps 3
    pump_water Two pumps of the same power fill the garden pool for 10 hours. How many of these pumps would have to use if we want to shorten the filling of the pool to four hours?
  9. Painter Pavel
    pixla_s_farbou Painter Pavel painted the fence for 16 hours and painter Petr the same fence painted for 13 h. How long should take painted the fence together?
  10. Greenhouses
    sklenik Two workers would make installation of greenhouses for 54 hours. For how many hours does the installation 9 workers?
  11. Painting rooms
    palma_1 If Dano paint three hours daily given work he complete in 7.5 days. How many hours a day would have to work to finish the job 1.5 days earlier?
  12. Tablecloth
    decka I embroider tablecloth in 20 days but if I embroider 3/4 hours a day I have embroider it for 15 days. How long do I embroider a day?
  13. Floating floor
    floor In the new building is considered a floating floor worker in each room. 30 minutes lay 9 m2 of the floor. How long 3 workers laid the floor in 4 rooms with a total area of 90 m2?
  14. Three workers
    three_workers Three workers A, B, C have to work on a specific task. Workers A and B completed whole task in 11 days, B together with C for 15 days, A together with C for 24 days. How long it would take to complete the task every one of them alone? How long it would.
  15. Supermarket cashiers
    tesco_1 When at the supermarket are opened only 2 cash people waiting in the front approximately 12 minutes. How many will shorten the average waiting time in a front where supermarket open another three cashiers?
  16. Trrops - soldiers
    troops Food stocks will last 20 soldiers of the 4-day training. How many days they could extend training if four soldiers become sick?
  17. Workers
    two_workers Workers A and B will done work together for 15 days. They worked together 13.5 days. Then A worker became ill and worker B finish the job alone for 7.5 days. If every worker was working alone, how many days took whole work for worker A and B?