Working time

At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?

Result

d =  20 d

Solution:

Solution in text d =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Most natural application of trigonometry and trigonometric functions is a calculation of the triangles. Common and less common calculations of different types of triangles offers our triangle calculator. Word trigonometry comes from Greek and literally means triangle calculation.

Next similar examples:

  1. Cook on gas
    lpg The gas cylinder will last for 30 weekends for 2 hours of daily cooking. How many days will we be able to cook on a new cylinder when we cook 3 hours a day?
  2. Road repair
    workers_1 Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair same road 37 workers if they work 8 per day?
  3. Pumps
    pumps_8 After the floods, four equally powerful pumps exhausted water from the flooded cellar in 6 hours. How many hours would take a drained out with three equally powerful pumps?
  4. Apprentice
    ucen Worker and apprentice execute the work for 6 hours. Worker performs himself in 10 hours. How long do the work of an apprentice?
  5. Trucks
    truck_big Truck take you the some amount of clay in 30 hours. Second truck in 40 hours. Trucks carted the clay away some time together then the second truck broke down and the first one completed the job in five hours. What time worked together?
  6. Two masters
    ucitelia_komplet The two masters will make as many parts as five apprentices at the same time. An eight-hour shift begins at 6 o'clock. When can a master finish the job to produce just as much as an apprentice for the whole shift?
  7. Painters
    natieraci Five painters painting the fence for eight days. How many days over will take work if paint the fence only four decorators?
  8. Sick
    kosela Six seamstresses should make 60 shirts in five business days. After three days two seamstresses were sick. How many days have the remaining seamstresses to finish contract?
  9. Mason with assistant
    workers_15 Mason had to complete the work in 10 days. Two and a half days later his assistant arrived. Together they completed the work in next three and a half days. How many days would he need an assistant for the same work?
  10. The tank
    pipe2_4 The tank had 9 inflows to be filled in 21 days. After 9 days, 3 trips out. How many days did the remaining 6 tributaries fill the tank?
  11. Hectoliters of water
    pumps_7 The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water at the same time?
  12. Five pumps
    nadrz_14 The water tank is filled with two pumps in 48 minutes. How long would it take to fill it with 5 same pumps?
  13. Pumps
    pumps Five pumps pumped 1,800 hl of water for 3 hours. How many hectoliters of water pump same two powerful pumps for six hours?
  14. Tmp workers
    profesiadays Three temporary workers cleaned 60 m of walkway in 5 hours. How many meters of the walkway cleared seven volunteers for eight hours?
  15. Cows
    cow_1 4 cows spent 16 bags of hay in 5 days. How many bags of hay sacks is needed for 5 cows for seven days?
  16. Five inlets
    pipe2_5 The tank can be filled with five equally powerful inlets. If the tank is filled by four of these inlets, it takes a total of 30 minutes to fill one-third of the tank. How many minutes does it take to fill an empty tank if it is filled with all five inlets?
  17. Liters od milk
    milk_cylinder The cylinder-shaped container contains 80 liters of milk. Milk level is 45 cm. How much milk will in the container, if level raise to height 72 cm?