Brick wall

Garden 70 m long and 48 m wide should surround with wall 2.1 meters high and 30 cm thick. How many we will need bricks if to 1 m³ is needed approximately 300 bricks?

Result

n =  44378

Solution:

Solution in text n =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Tip: Our volume units converter will help you with converion of volume units. Do you want to convert area units?

Next similar examples:

  1. Garden
    garden_1 Area of square garden is 4/5 of triangle garden with sides 24 m, 15 m and 15 m. How many meters of fencing need to fence a square garden?
  2. Triangles
    triangles_18 Hanka cut the 20 cm long straws into three pieces each piece had a length in cm. Then, with these three pieces, she tried to make a triangle. a) What circuit has each of the triangles? b) How long can the longest side measure? c) How many different trian
  3. Troops
    regiment Route is long 147 km and the first day first regiment went at an average speed 12 km/h and journey back 21 km/h. The second day went second regiment same route at an average speed 22 km/h there and back. Which regiment will take route longer?
  4. Blood
    krv In human body the blood is about 7.2% body weight. How many kilograms of blood is in the human body with weight 93 kg?
  5. Monkey
    monkey Monkey fell in 38 m deep well. Every day her scramble 3 meters, at night dropped back by 2 m. On that day it gets hangover from the well?
  6. Girls
    skola_10 The boys and girls in the class formed without the rest of the fives, 2 girls and 3 boys. There are 6 girls missing to create mixed pairs (1 boy and 1 girl). How many girls are in the classroom?
  7. Bonus
    moeny Gross wage was 1430 USD including 23% bonus. How many USD were bonuses?
  8. Forestry workers
    forestry_workers In the forest is employed 43 laborers planting trees in nurseries. For 6 hour work day would end job in 35 days. After 11 days, 8 laborers go forth? How many days is needed to complete planting trees in nurseries by others, if they will work 10 hours a da
  9. Motion problem
    dragway From Levíc to Košíc go car at speed 81 km/h. From Košíc to Levíc go another car at speed 69 km/h. How many minutes before the meeting will be cars 27 km away?
  10. Together
    work_1 If 8 men, 10 women, 16 children collects ₹1024 in 4 days, how many days will be required for 6 men, 5 women and 4 boys to collect ₹768? (₹ is Indian Rupee)
  11. Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection dig for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  12. Store
    pave One meter of the textile were discounted by 2 USD. Now 9 m of textile cost as before 8 m. Calculate the old and new price of 1 m of the textile.
  13. School
    ziaci_6 Less than 500 pupils attend school. When it is sorted into pairs, one pupil remains. Similarly, when sorted into 3, 4, 5 and 6 members team one remains. Sorted to seven members teams, no left behind. How many pupils are attending this school?
  14. Motion
    cyclist_1 If you go at speed 5.1 km/h, you come to the station 37 minutes after leaving train. If you go by bike to the station at speed 28 km/h, you come to the station 38 minutes before its departure. How far is the train station?
  15. Bus vs. train
    bus_vs_train Bus started from point A 10 minutes before the train started from the same place. The bus went an average speed of 49 km/h, train 77 km/h. To point B train and bus arrived simultaneously. Calculate time of train journey, if train and bus travelled the.
  16. Inflation
    dollar What is better for people (employees)? ?
  17. Root
    root_quadrat The root of the equation ? is: ?