Oil tank and pipes

The underground oil tank can be filled by two oil pipelines. The first is filled in 72 hours and the second in 48 hours. How many hours from the moment when first pipeline began to fill the oil is it necessary to start filling it with the second to fill in 1 and 1/2 day?

Result

t =  12 h

Solution:


t/72 + (36-t)*(1/72+1/48) = 1

3t = 36

t = 12

Calculated by our simple equation calculator.








Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Do you have a linear equation or system of equations and looking for its solution? Or do you have quadratic equation? Tip: Our volume units converter will help you with converion of volume units. Looking for a statistical calculator? Looking for help with calculating harmonic mean?

Next similar examples:

  1. Pumps
    pool_pump The tank is filled with two pumps in 16 minutes. The first pump is filled in 30 minutes earlier than two one. How many minutes is filled with the first pump?
  2. Repair pipe
    workers_39 20 workers had to repair broken pipes in 30 days. After fourteen days, four laborers joined them. How long did the pipe repair work last?
  3. Pool
    pool If water flows into the pool by two inlets, fill the whole for 18 hours. First inlet filled pool 10 hour longer than second. How long pool is filled with two inlets separately?
  4. Two workers
    mame_nizke_mzdy The first worker completed the task by himself in 9 hours, the second in 15 hours. After two hours of joint work left first worker to a doctor and the second finished the job himself. How many hours worked second worker himself?
  5. Tractors
    tractors Fields go plow two tractors with various performance. The first tractor plow whole field in 20 hours, the second tractor plow whole field 30 hours déle. How long take plow whole field with two tractors?
  6. Three drivers
    gas_car Three driversdriving the same direction found that they have same amounth of gasoline. The first is enough to go 6 km, 4 km second and third 3km. Gasoline they divided so all three just drove to the nearest petrol station. How many km away was a petrol sta
  7. Two workers
    Frog Two workers together execute some work in 10 days. The first worker would have done himself in 20 days. How many days would have done himself a second worker?
  8. Forestry workers
    forestry_workers In the forest is employed 43 laborers planting trees in nurseries. For 6 hour work day would end job in 35 days. After 11 days, 8 laborers go forth? How many days is needed to complete planting trees in nurseries by others, if they will work 10 hours a da
  9. Tablecloth
    decka I embroider tablecloth in 20 days but if I embroider 3/4 hours a day I have embroider it for 15 days. How long do I embroider a day?
  10. Logic
    blue-barrel A man drinks a barrel of water for 39 days, woman for 64 days, for how many days they drink barrel together?
  11. Tractors
    tractor_2 Six tractors plowing the field for 8 days. After two days, two tractors broke down. How many days were prolonged work in the field?
  12. Cows
    kravy0 20 cows has food for 60 days. We reduce the dose to two-thirds for 18 cows. How many days will be fed?
  13. Together
    work_1 If 8 men, 10 women, 16 children collects ₹1024 in 4 days, how many days will be required for 6 men, 5 women and 4 boys to collect ₹768? (₹ is Indian Rupee)
  14. Automaker
    car_manufactury The automaker now produces daily 4 new cars more than last year so the production of 360 cars will save just one full working day. How many working days to produce 360 vehicles needed last year?
  15. Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection dig for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  16. Tractors
    tractor 6 tractors started plowing the field that them together take 12 days. Agronomist hesitates to A) after 2 days to withdraw 2 tractors, or B) after 3 days to withdraw 3 tractors. Help him which of these two cases will be plowing done sooner.
  17. Floating floor
    floor In the new building is considered a floating floor worker in each room. 30 minutes lay 9 m2 of the floor. How long 3 workers laid the floor in 4 rooms with a total area of 90 m2?