Sick

Six seamstresses should make 60 shirts in five business days. After three days two seamstresses were sick. How many days have the remaining seamstresses to finish contract?

Result

t =  3

Solution:

Solution in text t =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Next similar examples:

  1. Two masters
    ucitelia_komplet The two masters will make as many parts as five apprentices at the same time. An eight-hour shift begins at 6 o'clock. When can a master finish the job to produce just as much as an apprentice for the whole shift?
  2. Holidays - on pool
    pool_4 Children's tickets to the swimming pool stands x € for an adult is € 2 more expensive. There was m children in the swimming pool and adults three times less. How many euros make treasurer for pool entry?
  3. Painters
    natieraci Five painters painting the fence for eight days. How many days over will take work if paint the fence only four decorators?
  4. Trucks
    truck_big Truck take you the some amount of clay in 30 hours. Second truck in 40 hours. Trucks carted the clay away some time together then the second truck broke down and the first one completed the job in five hours. What time worked together?
  5. Working time
    work_1 At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
  6. The tank
    pipe2_4 The tank had 9 inflows to be filled in 21 days. After 9 days, 3 trips out. How many days did the remaining 6 tributaries fill the tank?
  7. Painters 4
    painter_3 One painter will do the job for 12 days. After a 4 1/3 day he comes second to help him and complete work together for 8 days. How long would work the second painter himself?
  8. Evening shift
    workers_43 While working the evening shift, Officer K took 8 hours to complete a task at his work station and Officer M took 10 hours to complete the same task at his work station. How many hours would it take Officer K and Officer M to complete the same task working
  9. Cows
    cow_1 4 cows spent 16 bags of hay in 5 days. How many bags of hay sacks is needed for 5 cows for seven days?
  10. Road repair
    workers_1 Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair same road 37 workers if they work 8 per day?
  11. Three children
    chocholate_1 3 children eat 8 chocolates in 6 days. How many chocolates 6 children eat in 18 days?
  12. Cook on gas
    lpg The gas cylinder will last for 30 weekends for 2 hours of daily cooking. How many days will we be able to cook on a new cylinder when we cook 3 hours a day?
  13. Mason with assistant
    workers_15 Mason had to complete the work in 10 days. Two and a half days later his assistant arrived. Together they completed the work in next three and a half days. How many days would he need an assistant for the same work?
  14. Liters od milk
    milk_cylinder The cylinder-shaped container contains 80 liters of milk. Milk level is 45 cm. How much milk will in the container, if level raise to height 72 cm?
  15. Hectoliters of water
    pumps_7 The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water at the same time?
  16. Tmp workers
    profesiadays Three temporary workers cleaned 60 m of walkway in 5 hours. How many meters of the walkway cleared seven volunteers for eight hours?
  17. Assembly parts
    machine Nine machines produce 1,800 parts on nine machines. How many hours will it produce 2 100 parts on seven such machines?