Tanker

An oil tanker can be emptied by the first pump in 4.4 hours. Second pump can empty an tanker in 7.8 hours. If the first pump started at 8:00 and second 1.4 hour later, at what time will the tanker be empty?

Result

t =  3.3 h

Solution:

Solution in text t =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




To solve this example are needed these knowledge from mathematics:

Do you have a linear equation or system of equations and looking for its solution? Or do you have quadratic equation? Looking for a statistical calculator? Looking for help with calculating harmonic mean?

Next similar examples:

  1. Pumping
    pumps_1 The tank is filled with a larger pump in 12 hours and with scond pump in 15 hours. For how long does the tank fill when both pumps are switched on at the same time?
  2. Trucks
    truck_big Truck take you the some amount of clay in 30 hours. Second truck in 40 hours. Trucks carted the clay away some time together then the second truck broke down and the first one completed the job in five hours. What time worked together?
  3. Tributaries
    pritok The first tributary fill pool with water in 15 hours. The second tributary fill pool in 10 hours. For how many hours the pool is filled with both tributaries?
  4. Two tributaries
    bazen_2 Two tributaries of the pool fill it in 10 hours. One of the tributaries would fill 15 hours. How long would fill the first tributary?
  5. Pumps A and B
    pump_2 Pump A fill the tank for 12 minutes, pump B for 24 minutes. How long will take to fill the tank if he is only three minutes works A and then both pumps A and B?
  6. Workers
    workers Two workers fulfill a certain task when working together for 7 days, the first if he worked himself done work in 18 days. How many days will do whole job a second worker?
  7. Working together on project
    work_10 Two employees working on the project. First make it alone for 20 days the second for 24 days. How many days will take to complete project if 5 days they work together then first will take two days holiday and after returning they completes a project toget
  8. Welders
    svarec Welder do the job for six hours, the second one for 8 hours. How long do the job third welder if all together can do job in 2 hours?
  9. Apprentice
    ucen Worker and apprentice execute the work for 6 hours. Worker performs himself in 10 hours. How long do the work of an apprentice?
  10. Painters 4
    painter_3 One painter will do the job for 12 days. After a 4 1/3 day he comes second to help him and complete work together for 8 days. How long would work the second painter himself?
  11. Fifth of the number
    numbs_5 The fifth of the number is by 24 less than that number. What is the number?
  12. 12 Moons
    12_mesicku Good Marry came to ask twelve moons for help with collecting strawberries. All twelve moons 1200 strawberries picked in 20 minutes. But lazy months July and August cease tear after 5 minutes. How many minutes in total will take collect strawberries?
  13. Father and son
    family_17 Father is 48 years old, son 23. When will be the father twice older than a son?
  14. Six years
    children_9 In six years Jan will be twice as old as he was six years ago. How old is he?
  15. Tonic
    krem One package tonic consume Mom 12 weeks and daughter for 14 weeks. 4 weeks they use the same cream together and then only daughter. How many weeks endured tonic to daughter then?
  16. Simple equation
    axes_1 Solve for x: 3(x + 2) = x - 18
  17. Unknown number
    nums Identify unknown number which 1/5 is 40 greater than one tenth of that number.