The work

The work was to be done by 150 workers. At the beginning of their work, their number reduced by 40, which increased the time of work by 5 and 1/3 of the schedule. How long did work take?

Result

t =  20 d

Solution:

Solution in text t =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Do you have a linear equation or system of equations and looking for its solution? Or do you have quadratic equation? Most natural application of trigonometry and trigonometric functions is a calculation of the triangles. Common and less common calculations of different types of triangles offers our triangle calculator. Word trigonometry comes from Greek and literally means triangle calculation.

Next similar examples:

  1. Five pupils
    lavicka_1 Five pupils clean 30 chairs one hour before four pupils. How many chairs clean one pupil in 1 hour?
  2. Trucks
    truck_big Truck take you the some amount of clay in 30 hours. Second truck in 40 hours. Trucks carted the clay away some time together then the second truck broke down and the first one completed the job in five hours. What time worked together?
  3. Our house
    malovka_6 Our house would paint four painters in 14 days. How long could it paint five painters? How long will it take if two other painters will come to help after 5 days?
  4. Hectoliters of water
    pumps_7 The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water at the same time?
  5. Three people
    clocks_16 Three people start doing a work at a same time. The first worked only 2 hours. The second ended 3 hours before the end. On an individual basis, it would take the first time to do the work 10 hours, second 12 hours and 15 hours third. How many hours did it.
  6. Painters 4
    painter_3 One painter will do the job for 12 days. After a 4 1/3 day he comes second to help him and complete work together for 8 days. How long would work the second painter himself?
  7. 5 pumps
    pump Five pump to pump 3 hours 1600 hl of water. How long pumped same amount of water 4 pumps?
  8. The tank
    pipe2_4 The tank had 9 inflows to be filled in 21 days. After 9 days, 3 trips out. How many days did the remaining 6 tributaries fill the tank?
  9. Mason with assistant
    workers_15 Mason had to complete the work in 10 days. Two and a half days later his assistant arrived. Together they completed the work in next three and a half days. How many days would he need an assistant for the same work?
  10. 40% volume
    workers_41 40% volume with 104 uph (units per labor hour) 8 people working. What is the volume?
  11. Digging companies
    companies Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days and the company D for 24 days. Work began together companies C and D, but after three days joined them other two companies. How long took to dig a pit?
  12. Novak
    novakovci Novak needed to dig up three of the same pit in the garden. The first pit dug father alone for 15 hours. His second dig son helped him and it did that in six hours. The third pit dug son himself. How long it took him?
  13. Fifth of the number
    numbs_5 The fifth of the number is by 24 less than that number. What is the number?
  14. Walnuts
    orechy_2 x walnuts were in the mission. Dano took 1/4 of nuts Michael took 1/8 from the rest and John took 34 nuts. It stayed here 29 nuts. Determine the original number of nuts.
  15. Family
    family_14 Mom is 42 years old and her daughters 13 and 19. After how many years will mother as old as her daughter together?
  16. Simply equation
    img_reci Solve this equation for x: ?
  17. Six years
    children_9 In six years Jan will be twice as old as he was six years ago. How old is he?