Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Complete 19783
Two roofers were to cover the roof in 14 days. After five days, they added one roofer. How long will it take them to complete the work? How many days will it take them to cover? - Municipal 81852
Six workers repair 48 meters of municipal road in 2 days. How many days will 3 workers with the same output repair 60 meters of the road? - Four workers
Four workers lay on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take for the remaining three workers to complete their work? - Assemblers 47483
Two assemblers with the same daily output were to complete the assembly in 12 days. After 4 days, one of them got sick, and the other finished the assembly in another 16 days. How long would it take everyone to do the assembly by themselves?
- Roofers 20413
Three roofers put the roofing on the roof in 8 days. How long will it take to get two more after three days? - Repair pipe
Twenty workers had to repair broken pipes in 30 days. After fourteen days, four laborers joined them. How long did the pipe repair work last? - Sick
Six seamstresses should make 60 shirts in five business days. After three days, two seamstresses were sick. How many days have the remaining seamstresses to finish the contract? - City plan
The city planned to repair the highway section for 20 hours. Workers reduced this time by 20%. How long did the repair take? (express in hours and minutes) - Roofers 82541
Three roofers cover a third of the roof in 10 days. In how many days would 5 roofers cover the entire roof at the same rate?
- 3 men
Three men painting a house take 7 1/2 days. How long will 5 men take over the same job? Working at the same rate. - 10 workers
Ten workers will perform the assigned work in 8 days. How long will it take to get the job done if six workers work for six days, and then another six join them? - Workers 4168
Ten workers manage to repair the road in 22 days. After four days, two more workers joined to speed up the work. How many days does it take to repair the road? - Workers
Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job? - Seven
Seven dwarfs will cut 420 stumps in 15 hours. After five hours, the two dwarves disappear discreetly. How many hours will the remaining dwarves complete the task?
- Distribute 6298
Sixteen employees will distribute leaflets in 12 days. How long will it take if, after four breaths, six workers go to work elsewhere? - Roof repair
We need 15 pieces of boards 6 m long, 15 cm wide, and 25 mm thick to repair the roof. How many euros will we pay for all boards if 1 m³ of boards costs 500 euros? - Insulation
Two workers insulate the house for five days. After the first day of working together, only one worker continue to cover the house. How many days will the house be insulated if every worker has the same work tempo?