Road repair

Road repair took 16 days for 34 workers if they worked 6 hours a day.

How many days take repair same road 33 workers if they work 6 per day?

Result

x =  16.5 d

Solution:

Solution in text x =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Need help calculate sum, simplify or multiply fractions? Try our fraction calculator.

Next similar examples:

  1. Two workers
    workers_20 Two workers should fulfill certain task together for 5 days. If the first worker increased their performance twice and second twice fell, it took them just four days. For how many days would handle the entire task first worker himself?
  2. Forestry workers
    forestry_workers In the forest is employed 63 laborers planting trees in nurseries. For 11 hour work day would end job in 43 days. After 14 days, 22 laborers go forth. How many days is needed to complete a planting trees in nurseries by others, if they will work 15 hours
  3. Excavation
    vykop_ryha Mr. Radoslav calculated that excavation for a water connection dig for 10 days. His friend would take 7 days. Radoslav worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  4. Chickens
    chickens 4 chickens give 4 eggs in 4 days. How many eggs can give 8 chickens for 8 days?
  5. Cats
    cats Two cats caught two mice in two days. How many mouses will catch 10 cats for 10 days?
  6. Car
    american-cars Car goes from point A to point B at speed 70 km/h and back 76 km/h. If they goes there and back at speed 73 km/h trip would take 19 minutes shorter. What is distance between points A and B?
  7. Tractors
    tractors Fields go plow two tractors with various performance. The first tractor plow whole field in 5 hours, the second tractor plow whole field 5 hours longer. How long take plow whole field with two tractors?
  8. Pipes
    water_pipe Water pipe has a cross-section 1420 cm2. An hour has passed 831 m3 of water. How much water flows through the pipe with cross-section 300 cm2 per 8 hours if water flow same speed?
  9. Pool
    pool If water flows into the pool by two inlets, fill the whole for 9 hours. First inlet filled pool 8 hour longer than second. How long pool is filled with two inlets separately?
  10. Engineer Kažimír
    demagog_smer_1 The difference between politicians-demagogues and reasonable person with at least primary education beautifully illustrated by the TV show example. "Engineer" Kažimír says that during their tenure there was a large decline in the price of natural gas, pri
  11. Chocolate
    cokolada Charlie bought 7 same chocolates for 14 Eur. How many euros he pay for 27 chocolates?
  12. Cyclist
    1cyclist Cyclist goes uphill 1 km for 6.3 minutes and downhill minutes for 2.1 minutes, both applied to the pedals same force. How long he pass 1 km by plane?
  13. Medicament
    tablets Same type of medicament produces a number of manufacturers in a variety of packages with different content of active substance. Pack 1: includes 60 pills of 1200 mg of active substance per pack cost 18 Eur. Pack 2: includes 30 pills of 1000 mg of active s
  14. ŽSR
    luzianky Calculate fixed annual personnel costs of operating monorail line 106 km long if every 5 km is station, which serve three people - one dispatcher and two switchman in 3-shift operation. Consider the average salary of the employee 847 €.
  15. Washer
    pracka Washing machine drum wash at 75 RPM. Washing machine motor pulley has diameter 6 cm. What must be the diameter of the drum machine pulley when the motor is at 316 RPM?
  16. Tare
    camion Gross weight of shipment is 5073 kg and its tare is 6.9%. Calculate the net weight of the shipment.
  17. Wage
    socik Increasing the minimum wage while maintaining the other parameters of the system, unemployment will be: