Skier

At this point, the first skier lead 14 km before the second skier and travels at a constant speed 13 km/h. The second skier rides at 19 km/h.

How long take him to catch up the first?

Result

t =  2.33 h

Solution:

Solution in text t =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




To solve this example are needed these knowledge from mathematics:

Do you want to convert length units?

Next similar examples:

  1. Bus vs. train
    bus_vs_train Bus started from point A 25 minutes before the train started from the same place. The bus went an average speed of 41 km/h, train 67 km/h. To point B train and bus arrived simultaneously. Calculate time of train journey, if train and bus travelled the.
  2. Troops
    regiment Route is long 203 km and the first day first regiment went at an average speed 20 km/h and journey back 19 km/h. The second day went second regiment same route at an average speed 18 km/h there and back. Which regiment will take route longer?
  3. Pool
    pool If water flows into the pool by two inlets, fill the whole for 9 hours. First inlet filled pool 8 hour longer than second. How long pool is filled with two inlets separately?
  4. Two workers
    workers_20 Two workers should fulfill certain task together for 5 days. If the first worker increased their performance twice and second twice fell, it took them just four days. For how many days would handle the entire task first worker himself?
  5. Work
    workers_21 The first worker would need less than 4 hours to complete the task than the other worker. In fact, both workers worked for two hours together, then the first worker did the remaining work himself. In what proportion should the remuneration of the workers b
  6. Motion problem
    dragway From Košíc to Bratislavy go car at speed 76 km/h. From Bratislavy to Košíc go another car at speed 60 km/h. How many minutes before the meeting will be cars 22 km away?
  7. Motion
    cyclist_1 If you go at speed 6.1 km/h, you come to the station 51 minutes after leaving train. If you go by bike to the station at speed 17 km/h, you come to the station 43 minutes before its departure. How far is the train station?
  8. Train delay
    train_freight_4 The train should be in the station for 10 minutes. It still has 32 km left. What is the expected delay if the train travels in 2 minutes 3 km except for the last section where it is 2 km in 5 minutes.
  9. Excavation
    vykop_ryha Mr. Radoslav calculated that excavation for a water connection dig for 10 days. His friend would take 7 days. Radoslav worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  10. Clock
    hodiny How many times a day hands on a clock overlap?
  11. Monkey
    monkey Monkey fell in 31 m deep well. Every day her scramble 3 meters, at night dropped back by 2 m. On that day it gets hangover from the well?
  12. Hands
    soviet_watch The clock shows 12 hours. After how many minutes will agle between hour and minute hand 80°? Consider the continuous movement of both hands hours.
  13. Highway tunnel
    tunnel_1 The highway tunnel was built from two ends in the north-south direction. The average daily performance of the "northern party" rasters was higher than the average daily power of the "southern party" of the rasters. After 55 business days, both parties met.
  14. Logic
    blue-barrel A man drinks a barrel of water for 31 days, woman for 58 days, for how many days they drink barrel together?
  15. Server
    p_pro Calculate how many average minutes a year is the web server is unavailable, the availability is 99.99%.
  16. Grandfather and grandmother
    family_24 The old mother is 5 years younger than the old father. Together they are 153 years old. How many years has each of them?
  17. Forestry workers
    forestry_workers In the forest is employed 63 laborers planting trees in nurseries. For 11 hour work day would end job in 43 days. After 14 days, 22 laborers go forth. How many days is needed to complete a planting trees in nurseries by others, if they will work 15 hours