Common work - 8th grade (13y) - examples

  1. The factory
    clocks_13 The factory z can complete an order in 12 days, factory p in 18 days. For how many days does an order completed when the first two days work only the factory z and then both factories?
  2. Harvesters
    kombajn_10 The first harvester will harvest the grain from the field in 20 hours, the second, the more powerful in 10 hours. How long will take harvest this field by both harvesters, if the second harvester has to be set up first and this takes 2 hours? The first har
  3. A report
    work_4 Maricris can type a committee report in 5 hours. Jane helped Maricris and together they finished the report in 3 hours. How long would it take Jane to complete the report she had worked alone?
  4. Inlet and outlet
    bazen2_19 The pool has a capacity of 50 hl. The inlet pipe flows in 1 minute 1.25 hl, and the waste pipe outlet is draining the full pool in 50 minutes. How long will take the empty the full pool when both the inlet and outlet are opened at the same time?
  5. Soldier
    digging_1 An experienced soldier digs a good trench in 30 hours. Two soldiers dug the same trench each 40 hours. How many hours will the ditch dig all three together?
  6. Pool
    pool If water flows into the pool by two inlets, fill the whole for 18 hours. First inlet filled pool 10 hour longer than second. How long pool is filled with two inlets separately?
  7. Forestry workers
    forestry_workers In the forest is employed 43 laborers planting trees in nurseries. For 6 hour work day would end job in 35 days. After 11 days, 8 laborers go forth? How many days is needed to complete planting trees in nurseries by others, if they will work 10 hours a da
  8. Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection dig for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  9. Logic
    blue-barrel A man drinks a barrel of water for 26 days, woman for 48 days, for how many days they drink barrel together?
  10. Tractors
    tractors Fields go plow two tractors with various performance. The first tractor plow whole field in 11 hours, the second tractor plow whole field 19 hours longer. How long take plow whole field with two tractors?
  11. Road repair
    workers_1 Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair same road 37 workers if they work 8 per day?
  12. Workers
    two_workers Workers A and B will done work together for 15 days. They worked together 13.5 days. Then A worker became ill and worker B finish the job alone for 7.5 days. If every worker was working alone, how many days took whole work for worker A and B?
  13. Workers
    workers Two workers fulfill a certain task when working together for 5 days, the first if he worked himself done work in 13 days. How many days will do whole job a second worker?
  14. Garden
    garden_2 Father dig up the garden in 9 hours. Son in 13 hours. How many hours take dig up the garden together?
  15. Parquet floor
    Parkett Three workers laid parquet floor for 2.9 hour. The first one would do this work alone 9 hours, the second in 7 hours. For how many hours would fulfill this work the third worker, if he worked alone?
  16. Madams
    womans During the spring cleaning ladies going to wash windows. Mother takes wash all the windows 5 hours, the grandmother 3 times longer and Paula wash all windows in 2 hours. How many hours will spend washing the windows this "women's team" if working togethe
  17. Painter Pavel
    pixla_s_farbou Painter Pavel painted the fence for 16 hours and painter Petr the same fence painted for 13 h. How long should take painted the fence together?
  18. Tanker
    oil-tanker An oil tanker can be emptied by the first pump in 4.9 hours. Second pump can empty an tanker in 8 hours. If the first pump started at 4:00 and second 1.4 hour later, at what time will the tanker be empty?
  19. Water inlets
    pipe Inlet valve with a flow rate of 12 liters per second is filled tank for 72 minutes. How long take to fill full tank if we open one more such valve half an hour after?
  20. Three workers
    three_workers Three workers A, B, C have to work on a specific task. Workers A and B completed whole task in 11 days, B together with C for 15 days, A together with C for 24 days. How long it would take to complete the task every one of them alone? How long it would.

Do you have interesting mathematical example that you can't solve it? Enter it and we can try to solve it.



To this e-mail address we will reply solution; solved examples are also published here. Please enter e-mail correctly and check whether you don't have a full mailbox.