Working time
At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
Correct answer:
Tips for related online calculators
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- A stock
A stock of food is enough to feed 50 people for 14 days. How many days will the food last if 20 more people are added? - Building a wall
If 12 men can build a wall 398 meters long in 48 days, how long would it take 33 men to build a wall 347 meters long? Answer to 3 decimal places. - Strawberries
Three people pick strawberries from 48 rows in 8 hours. How many hours do five people need to pick strawberries from 20 rows? - The bricklayer
The bricklayer built a six-meter base of the fence in 3 hours. How long does it take to build a 14 m long base?
- Six identical
Six identical compressors inflate 180 balloons in one hour. How many balloons inflate one compressor in 10 minutes? - Book reading
Susan thought, "If I read 15 pages a day, I will read the whole book in 8 days. "How many pages would she have to read a day if she wanted to finish the book on the 6th day from the start of reading? And how many pages does the book have? - Mr. Ben
Mr. Ben drives bricks to the construction site. If he drove three times a day, he would make bricks in 8 days. How many times a day would he go every day to be done two days earlier? - Everyone drinks the same
Twenty-four bricklayers drink 72 beverage bottles a day at the construction site. How many bottles would 19 bricklayers need? Everyone drinks the same. - A truck 2
A truck leaves the home with building materials and makes a return trip every six days. To deliver all the materials, you need eight truck trips every month. How many trucks do you need?
- Reading
If I read 15 pages a day, I will read the whole book in 18 days. How long will it take to read a book if I only read nine pages every day? - Shoemaker
Both the shoemaker and his apprentice repaired his shoes. The apprentice worked for six days and repaired ten pairs of shoes daily. The shoemaker did the same job for four days. How many pairs of shoes did the shoemaker repair per day? - Book reading
Suzan reads a book. If she read half an hour a day, she would read it in nine days. How many minutes does he have to read a day if he wants to read it three days earlier? - Six workers
Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do seven workers earn in 10 days with the same daily average salary? - Five combers
Five combers harvest 12 rows of strawberries in 4 hours. How many rows of strawberries will two combers harvest in 10 hours?
- Cable car
The cable car will carry 1280 passengers in 40 minutes. How many people will be transported in 2.5 hours? - Five tractors
Five tractors plow the fields in 4.8 hours. How long will it take to plow the field when, after an hour and a half of work, two tractor drivers have been called up for another task? - The farmer
The farmer calculated that the supply of fodder for his 20 cows was enough for 60 days. He decided to sell two cows and a third of the feed. How long will feed the rest of the peasant's herd last?