Bricklayers
Eight bricklayers build a house for 630 days. How many bricklayers have to add after 150 days to complete the whole building in (next) 320 days?
Correct answer:
Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
You need to know the following knowledge to solve this word math problem:
Related math problems and questions:
- Bricklayers
Seven bricklayers will build the house in 630 days. How many bricklayers do we need to take after 150 days to complete the building for (additional) 336 days? - Complete 82405
8 masons build a house in 630 days. How many masons must we add after 150 days to complete the whole house in 320 days? - Bricklayers
When a bricklayer works to redeem the house in 8 days, the other bricklayer will be finished in 10 days. How long will it take to make three such houses together? - Bricklayers
The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and finished the work together. How long did it take to build the wall? - Building a wall
If 12 men can build a wall 398 meters long in 48 days, how long would it take 33 men to build a wall 347 meters long? Answer to 3 decimal places. - Competitors 2970
During the five-day car race, the route measured 879 km on the first and 650 km on the second. The competitors covered a total of 4,655 km. How many km did they cover in the next three days? - Forestry workers
56 laborers have employed planted trees in the forest. For 8 hour work, a day would end job in 37 days. After 16 days, 9 laborers go forth? How many days are needed to complete planting trees in nurseries by others if they work 10 hours a day? - Seamstresses 4635
Eight seamstresses have to complete the order in 16 days. After four days, the two seamstresses switched to another job. In how many days will the order be fulfilled? - Embankment 56451
Twenty men will build a dam in 36 days if they work 10 hours daily. How many hours a day do 30 men have to work if the embankment is to be completed in 16 days? - One-twentieth 82239
Peter and Honzo decided to build the building as quickly as possible. They built one-twentieth of the building in ten minutes. After 20 minutes, three more friends joined. Everyone was building at the same pace. How many minutes did it take to build the s - PLUS MINUS product
A. Deduct 15.728 from the sum of 23.234 and 6.23 B. Add 15.756 to the difference of 26.845 and 4.342 C. Find the product of 0.86 x 0.05 D. Multiply 5.234 by 4.45 E What is the product of 23.97 multiplied by 6.36? - Dimensions 70854
The building plot has a shape with dimensions of 28 m and 34 m. Mr. Černý built a house on it with 920 cm and 1250 cm dimensions. Calculate the content of the plot. How much of the plot does the house occupy? How many square meters of land does Mr. Černá - Revitalization 39191
Workers are building a new sidewalk while revitalizing the housing estate. Six workers will do the work in 12 days, but this is a problem because the sidewalk must be completed in 10 days to complete the work on time. How many workers must be hired to com - Budget plan
In the construction of the building, the planned budget exceeded 13%, which was 32,500 euros. How many euros did it cost to build the building? - Built-up area
John build-up area 5 x 7 = 35 m² with building with a wall thickness 30 cm. How many centimeters would he have to subtract from the thickness of the walls that the built-up area fell by 9%? - Mason with assistant
Mason had to complete the work in 10 days. Two and a half days later, his assistant arrived. Together they completed the work in the next three and a half days. How many days would he need an assistant for the same work? - Bricklayers 18773
According to the standard, we calculated that two masons would plaster the corridor of the new school building in 54 hours. How long would it take for nine bricklayers to plaster this corridor?