Repair pipe
Twenty workers had to repair broken pipes in 30 days. After fourteen days, four laborers joined them. How long did the pipe repair work last?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Workers 4168
Ten workers manage to repair the road in 22 days. After four days, two more workers joined to speed up the work. How many days does it take to repair the road? - Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate? - Repairman
The repairman has vowed to do repair work at the plant for 25 days. However, work had to be shortened, so he took a helper worker. Together they made all the corrections for the whole day. How long would it take work to help workers? - Lumberjacks
Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if the company added five workers to it after four days? - 2 pipes
Two pipes can fill a tank in 35 minutes. The larger pipe alone can fill the tank in 24 minutes less than the smaller pipe. How long does each piece take to fill the tank alone? - Opened 64544
We can fill the pool with two inflow pipes. The first pipe fill in 24 hours and the second in 16 hours. How long did the pool fill if the first tube was open for the first 4 hours and then we opened both inlets? - Forestry workers
56 laborers have employed planted trees in the forest. For 8 hour work, a day would end job in 37 days. After 16 days, 9 laborers go forth? How many days are needed to complete planting trees in nurseries by others if they work 10 hours a day? - Digging companies
Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days, and company D for 24 days. Work began together with companies C and D but after three days. They joined the other two companies. How long took to dig a pit? - Expedition 82407
Food for 56 sailors would last 32 days. How long did the food supplies last the expedition if 14 castaways were taken on board after 12 days of sailing? - Repairing 80759
They spent three days repairing the damaged pipe, 115 m long. On the first day, they repaired a quarter of what they did on the second day, and on the third day, they repaired 20m less than on the second day. How many m of pipe did they repair on the firs - Road repair
Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair the same road 37 workers if they work 8 per day? - Highway repair
The highway repair was planned for 15 days. However, it was reduced by 30%. How many days did the repair of the highway last? - Tributary 3466
The swimming pool is filled with four inflow pipes in 9 hours. If one tributary is broken, how long will it be filled? - Two pipes
One pipe fills one-fifth volume 20 minutes before my second one. The two pipes together will fill the tank in two hours. How long will fill the tank of each pipe separately? - Municipal 81852
Six workers repair 48 meters of municipal road in 2 days. How many days will 3 workers with the same output repair 60 meters of the road? - Equally 83095
John and Joseph carved the garden in 6 days. If an equally fast George joined them, how many days would it take them? - Work
The first paver paves pavement for 27 hours. Second for 27 hours. I started the first paver and, after 4 hours, joined the second. How long will they finish the pavement?