Four pavers
Four pavers would pave the square in 18 days. How many pavers do you need to add to the done work in 12 days?
Correct answer:
Showing 3 comments:
Idk
the answer should be 6,
the total "power" (as I like to call it) is 4 x 18, which is 72.
You divide that by 12, giving you six.
The calculator is wrong. Six pavers are needed.
the total "power" (as I like to call it) is 4 x 18, which is 72.
You divide that by 12, giving you six.
The calculator is wrong. Six pavers are needed.
User
Re @idk
4 * 18 = 12(4+n)
72 = 12(4+n)
-----------------
12
6 -4 =4 - 4+n
6 - 4 = n
2 = n
4 * 18 = 12(4+n)
72 = 12(4+n)
-----------------
12
6 -4 =4 - 4+n
6 - 4 = n
2 = n
Tips for related online calculators
Looking for calculator of harmonic mean?
Looking for a statistical calculator?
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Looking for a statistical calculator?
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk? - Remaining 82419
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job? - Performance 31371
According to the plan, seven pavers were to pave the square in 14 days. After two days of work, another 5 pavers came to help them. How many days from the arrival of the pavers will the work be completed? (tile performance is the same) - Workers
Two workers would fulfill a certain task when working together for 5 days, the first if he worked himself done work in 13 days. How many days will the second worker do the whole job? - 20-meter-long 39603
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk: a) 4 workers b) 5 workers c) 10 workers - Seven workers
Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours? - Hall
The rectangular hall will have to pave with square tiles with a side length of 15 cm. The hall has a length of 18 meters and a width of 3 m. How many tiles need to buy if 2 percent of the amount is disrupted during the work? - Two workers
Two workers together execute some work in 10 days. The first worker would have done it himself in 20 days. How many days would they have done himself a second worker? - Two workers
Two workers will do certain work for 12 days. After eight days of working, one was removed, and the other finished the job alone in 10 days. For how many days would you do this work alone for each worker? - Three painters
The three painters have painted bridges. The first would work done in 5 days, the second in 6 days, and the third in 7.5 days. How long will the bridge work if they work together? - A truck 2
A truck leaves the home with building materials and makes a return trip every six days. To deliver all the materials, you need eight truck trips every month. How many trucks do you need? - Mr. Ben
Mr. Ben drives bricks to the construction site. If he drove three times a day, he would make bricks in 8 days. How many times a day would he go every day to be done two days earlier? - The orchard
Four temporary workers harvested the orchard in 9 days. How many temporary workers do we need for six days? - Workshops
The first workshop will do the robot itself in 15 days, and the second workshop in 10 days. They started together, but only the second workshop worked after three days. How many days will the work be done? - Work
The first worker would need less than 4 hours to complete the task than the other worker. In fact, both workers worked for two hours together. Then the first worker did the remaining work himself. In what proportion should the remuneration of the workers - Performance 4067
Twenty students will plant 1,200 trees in 4 hours. How many students do you need to plant 2100 trees in 3 hours at the same performance? - Copiers
Three copiers will do the same in an hour, k copies. How many copies would be done in an hour by four such copiers? ...