Direct relationship + work - math problems
Number of problems found: 50
- Working time
At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
- Temporary workers
Three temporary workers work in the warehouse and unload the goods in 9 hours. In what time would five temporary workers unload the same products?
- Painters
Ten painters paint the school in 20 days. How many days do four painters paint the school at the same pace of work?
- Workers
Ten workers must pave road street for 22 working days. After four days were for speeding up work added two more workers. a) After how many work days now workers completes the paved road? b) How many working days it took a total paved road?
- Working time - shortening
The media often speculates about the change (especially to shorten) the working time of the five-day eight-hour working week to another working model. Calculate how many hours a day the employee would have to work a day at 3-day work week if he must work
- Painting rooms
If Dano paint three hours daily given work he complete in 7.5 days. How many hours a day would have to work to finish the job 1.5 days earlier?
- Six students
Two pupils painted the class in four hours. How long will it take for six pupils?
- Five tractors
Five tractors plow the fields in 4.8 hours. How long will it take to plow the field when, after an hour and a half of work, two tractor drivers have been called up for another task?
- Road repair
Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair same road 37 workers if they work 8 per day?
- Three workers
Three workers got paid for work. First earn € 50, the second € 100 and third € 60. For further work should receive together € 735. How do you divide that amount in order to be distributed in the same proportion as the first job?
- Forestry workers
In the forest is employed 56 laborers planting trees in nurseries. For 8 hour work day would end job in 37 days. After 16 days, 9 laborers go forth? How many days are needed to complete planting trees in nurseries by others if they work 10 hours a day?
- The orchard
4 temporary workers harvested the orchard in 9 days. How many temporary workers we need for six days?
- Greenhouses
Two workers would make installation of greenhouses for 54 hours. For how many hours does the installation 9 workers?
- Cable car
The cable car will carry 1280 passengers in 40 minutes. How many people will be transported in 2.5 hours?
- Assembly parts
Nine machines produce 1,800 parts on nine machines. How many hours will it produce 2 100 parts on seven such machines?
- Troops - soldiers
Food stocks will last 20 soldiers of the 4-day training. How many days they could extend training if four soldiers become sick?
- Tmp workers
Three temporary workers cleaned 60 m of walkway in 5 hours. How many meters of the walkway cleared seven volunteers for eight hours?
- Hour salary
You work for 4 hours on a Saturday and 8 hours on Sunday. You also receive a $50 bonus. You earn $164. How much did you earn per hour?
- Pumps
After the floods, four equally powerful pumps exhausted water from the flooded cellar in 6 hours. How many hours would take a drained out with three equally powerful pumps?
- Everyone drinks the same
24 bricklayers drink 72 beverage bottles a day at the construction site. How many bottles would 19 bricklayers need? Everyone drinks the same.
Do you have an interesting mathematical word problem that you can't solve it? Submit a math problem, and we can try to solve it.
Direct relationship - math word problems. Work - math word problems.