Quadratic equation + work - practice problems
Number of problems found: 22
- Recommended: 81764
If the interval between bus arrivals is shortened by one minute, there will be 5 more buses on this route per hour. How many buses ran on the original route? (Recommended: solve with an experiment or a table where we look for the dependence between the le - A construction 2
A construction company will be penalized for its bridge construction delays. The penalty is set at 4,000 for the first day and shall be subjected to a 1,000 increase for each succeeding day. The company can afford a maximum payment of 165,000 for a penalt - Construction 64524
The bricklayer and the apprentice will build the wall in 6 hours. If the bricklayer worked alone, the wall construction would take him 5 hours shorter than the apprentice. How long before the wall would the bricklayer build himself? - Intended 63664
Farmers had to sow 200 hectares of fields. They reduced the planned sowing time by two days while planting 5 hectares more each day than intended. How many days did the sowing last? - Two workers
One worker makes a part 4 hours and the second 9 hours later than they would make the same part together. How long does it take for each worker to make the part himself? - Rectangular 26641
The area of the work surface of the rectangular table is 70 dm2, and its perimeter is 34 dm. Determine (in dm) the length of the shorter side of this table. - Working alone
Tom and Chandri are doing household chores. Chandri can do the work twice as fast as Tom. If they work together, they can finish the work in 5 hours. How long does it take Tom to work alone to do the same work? - Two pipes
How long will the pool be filled with a double supply pipe if it takes the pool to fill the first pipe by 4 hours long and the second pipe 9 hours longer than both pipes open simultaneously? - 2 pipes
Two pipes can fill a tank in 35 minutes. The larger pipe alone can fill the tank in 24 minutes less than the smaller pipe. How long does each piece take to fill the tank alone? - Work
The first worker would need less than 4 hours to complete the task than the other worker. In fact, both workers worked for two hours together. Then the first worker did the remaining work himself. In what proportion should the remuneration of the workers - Two workers
Two workers should fulfill specific tasks together for five days. If the first worker increased their performance twice and the second twice fell, it took them just four days. For how many days would he handle the entire task, the first worker himself? - Calculate 5619
Jana had to calculate 70 tasks, and if she had solved two more daily tasks than she had planned, she would have finished four days earlier. How many days did she have to calculate the tasks? - Wagons and cranes
The same cranes are unloading 96 wagons. There would be fewer wagons for each crane if there were two more cranes. How many cranes were there? - Everyone 4572
Two workers completed the work in 12 days. If the other worked ten days longer than the first, how long would everyone work alone? - Work together
Michal and Dorota would do the work together in 2.25 hours. If Dorota had to do it herself, it would have taken her 6 hours longer than Michal. Determine when Dorota would do the work herself and that Michal would do it himself. - Blueberries 2
Lenka and Martin collected eight liters of blueberries in two hours. How long will Lenka take to collect blueberries itself if we know that she collects all 2.5 hours less than Martin? - Two pipes
One pipe fills one-fifth volume 20 minutes before my second one. The two pipes together will fill the tank in two hours. How long will fill the tank of each pipe separately? - Two masons
Two masons built the garage together - it took 18 days. If they worked independently, the other would work 15 days more than the first. For how many days would build the garage each mason himself? - Copiers
The new copier is copying a folder of papers 5 minutes faster than the old one. The operator used new, but out of toner and exchange took 5 min at that time copied on the old. The whole work was done in 9 min. How long would the work do only by the old co - Automaker
The automaker now produces daily 4 new cars more than last year, so the production of 360 cars will save just one full working day. How many working days to produce 360 vehicles were needed in the previous year?