Rounding + work - math problems

Number of problems found: 12

  • Jimmy
    clocks2 Jimmy earns an average of php 140.50 per hour in offering a Math tutorial. At least how many hours does he need to work to earn Php 1,100.00?
  • Jewelry factory
    diamonds In a jewelry factory, three assemblers make beaded necklaces.  Marcus can make 22 necklaces per hour all day long. Anita can make 25 necklaces for her first three hour of the days and then slow down to 16 necklaces for the rest of the day. Yara can make 2
  • The sides 3
    equilateral_triangle The sides of an equilateral triangle are 9.4 cm, correct to the nearest one decimal place. Work out the upper bound of the side of this triangle.
  • A truck 2
    kamion2 A truck leaves home with building materials and makes a return trip every six days. To deliver all the materials, you need eight truck trips every month. How many trucks do you need?
  • Seven workers
    wood Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours?
  • Ten cashiers
    pokladna Ten cashiers are open at Tesco. Customers wait an average of 15 minutes. How many other cashiers have to open to reduce the waiting time by 4 minutes?
  • Food weight
    vaha Stacie is a resident at the medical facility where you work. You are asked to chart the amount of solid food that she consumes. For the noon meal, today she ate 1/2 of a 3-ounce serving of meatloaf, 3/4 of her 3-ounce serving of mashed potatoes, and 1/3 o
  • Bricklayers
    murar Seven bricklayers will build the house in 630 days. How many bricklayers do we need to take after 150 days to complete the building for (additional) 336 days?
  • Sewing
    sewing Beth's mother can sew 235 pairs of short pants in 6 days while Lourdes can sew 187 pairs in 8 days. How many more pairs of short pants can Beth's mother sew?
  • Wood harvesting
    woord The harvested wood is bundled from the forest to a sawmill. The driver makes the journey four times a day, and the work takes him 8 days. How many times would he have to go daily to get the job done 2 days earlier?
  • Hall
    zamkova_dlazba Rectangular hall will have pave by square tiles with a side length 15 cm. The hall has length 18 meters and width 3 m. How many tiles need to buy if 2 percent of the amount is disrupted during the work?
  • Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection digs for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of the excavation they met?

We apologize, but in this category are not a lot of examples.
Do you have an exciting math question or word problem that you can't solve? Ask a question or post a math problem, and we can try to solve it.



We will send a solution to your e-mail address. Solved examples are also published here. Please enter the e-mail correctly and check whether you don't have a full mailbox.

Please do not submit problems from current active competitions such as Mathematical Olympiad, correspondence seminars etc...



Do you want to round the number? Rounding - math problems. Work word problems.