- Three painters
One painter would have painted the fence for 15 hours, the second for 12 hours. The plot had to be painted in four hours, so they called the third one, and all worked together. For what time would the third painter paint fence the fence alone? - 2 pipes
Two pipes can fill a tank in 35 minutes. The larger pipe alone can fill the tank in 24 minutes less than the smaller pipe. How long does each piece take to fill the tank alone? - Machines 2
Two machines for 50 hours produce 2,000 products. How many machines need to buy to make in 30 hours 15,000 products? - Painting
Joseph with Fero painted the bench for four hours. How many hours would it take to work if four friends helped him? - Remaining 82419
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job? - Complete 82405
8 masons build a house in 630 days. How many masons must we add after 150 days to complete the whole house in 320 days? - Identical 81873
Three identical pumps empty the tank in 1.8 hours. How long will it take 5 pumps to empty this tank? - Workers 54253
Four workers packed the goods with the same output in 6 hours. In how many hours would five workers do the same job? Express it in hours and minutes. - Bricklayer 38291
A bricklayer will lay 12 m³ of brickwork in 4 days if he works 7 hours a day. How many days will he lay 51 m³ of masonry if he works 8.5 hours daily? - Adjustment 20163
Two students adjust the flower bed in 3 hours. How long will this adjustment take for the pupils if they invite four helpers? - Complete 19783
Two roofers were to cover the roof in 14 days. After five days, they added one roofer. How long will it take them to complete the work? How many days will it take them to cover? - Produced 18213
In the factory, they produced 1,500 products a week on five machines. How many machines do they need to produce 2,000 products a week? - Together 5931
The tank will be filled with the first inlet in 5 hours and the second in 12 hours. How long would it take to fill the tank together? - Everyone 4572
Two workers completed the work in 12 days. If the other worked ten days longer than the first, how long would everyone work alone? - Performance 4067
Twenty students will plant 1,200 trees in 4 hours. How many students do you need to plant 2100 trees in 3 hours at the same performance? - Workers
Suppose John starts work at 8:45 AM and finishes at 5:15 PM. He has 90 minutes of breaks. How many hours does he work in 5 days? - Shoemaker
Both the shoemaker and his apprentice repaired his shoes. The apprentice worked for six days and repaired ten pairs of shoes daily. The shoemaker did the same job for four days. How many pairs of shoes did the shoemaker repair per day? - Motorcycle engine
The motorcycle engine has a constant power of 1.2 kW for 0.5 hours. How much work does the engine do? Express work in kWh and Ws units. - Two machines
The first machine can produce parts in 24 hours, and the second in 16 hours. The first started working at 6:00 pm. Second at 10:00. At what hour all parts were made? - Three pumps together
One pump fills the tank in 1.5 hours, the second in 2 hours, and the third in 3 hours 20 minutes. How many minutes will the tank fill with three pumps if they work simultaneously?