Excavation machine distribution

Excavation work was carried out by nine double-performance machines, which excavated 420 meters of excavation in one day. How many were there if the more powerful machine excavated 420 meters in a week (7 days) and the less powerful engine excavated 280 meters simultaneously?

Your answer:



Help us improve! If you spot a mistake, please let let us know. Thank you!







Tips for related online calculators
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?

You need to know the following knowledge to solve this word math problem:

algebrabasic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem

Related math problems and questions: