Work word problems - page 14 of 43
Number of problems found: 846
- Motor efficiency
The electric motor with a power input of 25 kW works with an efficiency of 80 percent. He will do the work in 6 hours. What is the performance, and what part of the work is the loss? - Jewelry factory
In a jewelry factory, three assemblers make beaded necklaces. Marcus can make 22 necklaces per hour all day long. Anita can make 25 necklaces for her first three hours of the day and then slow down to 16 necklaces for the rest of the day. Yara can make 2 - Workshops
The plant has three workshops. In the first workshop, produce five products/hour. In the second 8 products/hour, and in the third, seven products/hour. In the first workshop, they produced 240 products. In the second 400 and the third 350 products. Find t - Cathedral roof sphere
Cathedral height is 110 m, sphere weight 6000 kg, dome diameter 43 m, crane arm length 25 m a) what was the diameter of this sphere? b) how much mechanical work had to be done to lift it to the designated place? - Transmission of electricity
The electric field performs work 1610 J in the transmission of electric charge of 7 Coulombs between the heating coil terminals. Calculate the voltage between the terminals. - Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk? - Carpenter chair
Eight carpenters will make 30 chairs in 2 days. In how many days will ten carpenters make 72 chairs? - Truck concrete
Ten identical trucks will take 240 tons of concrete to build the dam in 3 working days. How many tons of concrete will seven trucks take to make the dam in 5 days? - Painter bridge
Two painters will paint the bridge in 12 days. How many painters must we employ if we need to paint the bridge in 8 days? - Fence worker
Four workers were supposed to build 200m of the fence in 15 days. However, after 3 days, two more workers came to their aid. All workers were equally efficient. Calculate how many meters of the fence (from the original 200m) remained after the first 3 day - All tasks - taskman
Skilled workshop master washes client's car in 1/5 hour, cleans client's car in 5/4 hour, and paints small defects on car 1 1/3 hour. How long did it take him to do all the necessary work tasks? - Book reading
Michael will read the book in 8 days if she reads 15 pages daily. How many pages does she have to read per day if she wants to finish the book six days after the start of reading? How many pages does the book have? - Seamstress order
Eight seamstresses will make the order in 15 shifts. How many will be sewists if they have to complete an order three shifts earlier? - The pet
Ananya has a bunny. She bought 4 7/8 pounds of carrots. She fed her bunny 1 1/4 pounds of carrots the first week. She fed her bunny 5/6 pounds of carrots the second week. Altogether, how many pounds of carrots did she feed her bunny? 1. Draw a tape diagra - Candy bars
Sheldon has four candy bars and wants to split them among his five friends. If each person gets the same amount, what part of the candy bar will each friend get? Show your work. - Nail work
What work do we do if we pull out a 58mm nail with an average force of 350N? - Tank inflow time
We would fill the water tank with one inflow in 3 hours and the other inflow in 2 hours. How long will it take for both tributaries to open? - Together m+d
Aunt Jane would paint her apartment in 10 hours and her mother in 15 hours. How much do they paint it together? - Worker repair time
The worker performs the repair work in 20 days, and his assistant does the job himself in 60 days. How many days would they work together? - Reservoir pump filling
The reservoir is filled with a large pump in 20 hours, a medium in 24 hours, and a small one in 30 hours. If all pumps are switched on simultaneously, how many hours will it be filled?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.
