Time - examples - page 12

  1. Aircraft
    samair Flight length 3457 km took 5 hours. The airport passengers had to arrive hours in advance, 2 hours. Departure was delayed for 6.4 hours. The destination airport formalities took 0.4 hours. Calculate the average speed of passenger travel from arrival to le
  2. Troops - soldiers
    troops Food stocks will last 20 soldiers of the 4-day training. How many days they could extend training if four soldiers become sick?
  3. Bomber
    tu-160 The aircraft flies at an altitude of 4100 m above the ground at speed 777 km/h. At what horizontal distance from the point B should be release any body from the aircraft body to fall into point B? (g = 9.81 m/s2)
  4. Pool 2
    bazen_pritok The first supply by the pool fill for five hours and the second fill for six hours, drain should be drained for 15 hours. For how many hours the pool is full, when we open both inlet now and outlet open two hours later?
  5. Painting rooms
    palma_1 If Dano paint three hours daily given work he complete in 7.5 days. How many hours a day would have to work to finish the job 1.5 days earlier?
  6. Simple interest 4
    coins-uk_2 Find the simple interest if 5243 USD at 4.3% for 261 days. Assume a 361-day year.
  7. Salary
    kcs Mr. Johnson's had monthly salary 955 USD since the beginning of year. From which month his salary was increased by 52 USD, when in year earned 11824 USD (enter as a number from 1 to 12)?
  8. Radioactivity
    radioactivity After 548 hours decreases the activity of a radioactive substance to 1/9 of the initial value. What is the half-life of the substance?
  9. Cars
    car_red Cars started at 7:00 AM. From point A car run at 40 km per hour, from B car run 70 km per hour. Between A and B is 250 km long road. When and where will meet (measured from point A)?
  10. Motion 2
    motion2 At 10 o'clock started from place A car speed at 90 km/h. 20 minutes after started from the place B at speed 60 km/h another car. Distance places A and B is 120 kilometers. What time and where they meet?
  11. Freight and passenger car
    1999_Daewoo_Leganza The truck starts at 8 pm at 30 km/h. Passenger car starts at 8 pm at 40 km/h. Passenger arrives in the destination city 1 hour and 45 min earlier. What is the distance between the city of departure and destination city?
  12. Digging companies
    companies Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days and the company D for 24 days. Work began together companies C and D, but after three days joined them other two companies. How long took to dig a pit?
  13. One and a half chicken
    chicken_1 One and a half chicken bears one and a half egg in one and a half day. How many eggs can withstand from 6 chicken in 6 days?
  14. Wind drift
    airplane The plane flies at 860 km/h, passing distance 3000 kilometers with the wind and once again against the wind for 6 h 59 min. What is the wind speed?
  15. Aircrafts
    boeings Above the town hall tower flew the plane with constant speed 592 km/h and 15 minutes later the second plane at speed of 675 km/h. How long and how far from the town hall will be aircrafts caught up?
  16. Bank deposit
    bank_1 Ms Jana after the withdraw amount of 2,500 euros after year saving in bank. What was her deposit if the interest rate was 2.5% p.a..
  17. Cars motion
    AB From point A car start at the speed of 90 km/h. Against it departs from the point B at the same time another car at 60 km/h. For how long and where they met if the distance between A and B is 180 km?
  18. Pair
    dvaja They have together 39 years - he has 2 times as she was when he was equal as she has today ....
  19. The dam
    prehrada-orlik The water reservoir is filled with first tributary for 25 hours second tributary for 35 hours. Some time were both inlets open, then a second tributary closed and the tank was filled in four hours. What time water flowed from both tributaries? (Expressed i
  20. Workers
    zamkova_dlazba Ten workers must pave road street for 22 working days. After four days were for speeding up work added two more workers. a) After how many work days now workers completes the paved road? b) How many working days it took a total paved road?

Do you have interesting mathematical example that you can't solve it? Enter it and we can try to solve it.



To this e-mail address we will reply solution; solved examples are also published here. Please enter e-mail correctly and check whether you don't have a full mailbox.