Time - math word problems - page 81 of 163
Number of problems found: 3254
- Cylinder-shaped 21363
82 hl of water per hour flows into the empty cylinder-shaped pool with a bottom diameter of 7.5 m. How high will the pool be filled if the water has flowed in for 4 hours? - Working together
Two people will do the work in 12 days. They worked together for eight days. Then only one worked for ten days. How many days would each of them do the work if he worked alone? - The shooter
The shooter heard the bullet's impact on the target one second after the shot. The bullet was moving at an average speed of 500 m/s. Calculate with the speed of sound of 340 m/s. Determine the distance of the target. - Christmas holidays
How many percent take Christmas holidays lasting 18 days from a school year that lasts 303 days? Round the result to two decimal places - Compound interest 4
Peter placed 3600 dollars in an account with an annual interest rate of 9%. How much will be in the account after 25 years, to the nearest cent? - Hectares of forest
Twelve workers plant 24 ha of forest in 6 days. How many days will 15 people and 12 people plant in the same area? - Sick colleague
All the classrooms at school were painted during the holidays. On the first day, 6 painters did one sixth of the required work. From the second day until the painting was finished, only 5 painters worked because one of them got sick. All the painters work - Anniversary 20843
Mr. and Mrs. Novák announce the celebration of their 190th anniversary - that's how many years they've been together this year. How old are Mr. Novák and Mr. Novák if we know that Mr. Novák is nine years older than Mrs. Novák? - Powerful 20773
The 300 liters per minute water starts to flow into the empty pool. We will fill the pool in 5 hours. How long would it take to fill a pool with a more powerful 750L pump per minute? - Earnings 20763
Two workers worked on a joint task: One worked 36 hours and the other 40 hours. Earnings of 11400 are divided by the ratio of hours worked. How much did everyone get? - Apprentice 20753
The trained worker will do the work in 4 hours. The apprentice needs 6 hours for the same work. How many hours and minutes would they do this work if they worked together? - The orchard
Four temporary workers harvested the orchard in 9 days. How many temporary workers do we need for six days? - Pedestrian 20613
Cyclist speed and pedestrian speed are in the ratio of 16:3. The pedestrian will drive 4.5 km per hour. How many cyclists will travel in 2 hours? - Distance 20493
A snail emerges from the leaf at a speed of 1 cm/min. At the same time, an ant rushes towards it from the stone at a speed of 5 cm/min. The distance between the leaf and the stone is 1.2 meters. How soon will they meet, and at what distance? - Travels 20483
When and where will the two cars that drove at the same time from cities A and B 90 km apart if the car from city A travels at a speed of 75 km/h and the car from city B at a speed of 60 km/h meet? - Motorcyclist 20473
The cyclist leaves place A at a speed of 25 km/h. A motorcyclist rides against him at a speed of 55 km/h. The distance between places A and B is 60 km. When and where do I meet? - Roofers 20413
Three roofers put the roofing on the roof in 8 days. How long will it take to get two more after three days? - Timetable 20313
The train ran the distance between stations at a 90km/h speed in 4 hours. What speed can it take if the journey takes an hour longer according to the new timetable? - Building 20293
Two workers will build the building in 10 hours. How many hours would they have built the building if three more workers had helped them? - Approximately 20243
Lake Trasimeno is approximately in the shape of a circle, its area is about 28 square kilometers, and Mr. Hector's walking speed is approximately 4km/h. Calculate the length of the path around the lake and how many hours Mr. Hector would have to walk to o
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question.
