The field

3 tractors plow the field in 6 hours. However, after 2 hours, 1 tractor broke down. How long will the field be plowed?

Correct answer:

t =  8 h

Step-by-step explanation:


3•6 = 3•2 + (3-1)•(t-2)

2t = 16

t = 8

Our simple equation calculator calculates it.



Did you find an error or inaccuracy? Feel free to write us. Thank you!



avatar




Tips to related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?

You need to know the following knowledge to solve this word math problem:

Related math problems and questions:

  • Tractors
    tractor Two tractors plow the field in 4 hours together. If the first tractor plow half of the field and then the second tractor completed the job, it would take 9 hours. How many hours does the field plow for each tractor separately?
  • Tractors
    tractors 5 tractors will plow the field for 8 hours. In 2 hours, 1 tractor broke down. How long do the remaining tractors complete the plow?
  • Tractors
    tractors Fields go plow two tractors with various performances. The first tractor plows the whole field in 11 hours, the second tractor plows the whole field 19 hours longer. How long take plow the whole field with two tractors?
  • Five tractors
    tractors Five tractors plow the fields in 4.8 hours. How long will it take to plow the field when, after an hour and a half of work, two tractor drivers have been called up for another task?
  • Five tractors
    tractor Five tractors plow the field in 4.8 hours. How long will it take to plow this field if after 1.5 hours of work, two tractors went to a different field?
  • Tractors
    tractor Six tractors plowing the field for 8 days. After two days, two tractors broke down. How many days were prolonged work in the field?
  • Tractors
    tractor Wheel and belt tractors each day plow 8 ha of fields. For plow 76 hectares, the wheel would have to work for 12 days and 8 days with the belt tractor together. How many hectares do each day of each tractor?
  • Seven tractors
    koleso Seven tractor plowed 308 ha field in four days. How many hectares of fields will plowe 9 tractors in 3 days at the same power?
  • Trucks
    truck_big Truck take you the some amount of clay in 30 hours. Second truck in 40 hours. Trucks carted the clay away some time together then the second truck broke down and the first one completed the job in five hours. What time worked together?
  • Harvesters
    kombajn The first harvester will harvest the grain from the field in 20 hours, the second, the more powerful in 10 hours. How long will it take to harvest this field by both harvesters if the second harvester has to be set up first and this takes 2 hours? The fir
  • Digging
    digging The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together?
  • Workers 2
    delnik Worker dug the trench for 7 hours, another worker for 10 hours. They recruited to work even one worker more. Digging should be done for 2 hours. For how long would dig third worker alone?
  • Three people
    clocks Three people start doing a work at a same time. The first worked only 2 hours. The second ended 3 hours before the end. On an individual basis, it would take the first time to do the work 10 hours, second 12 hours and 15 hours third. How many hours did it
  • Two workers
    work One worker needs 40 hours to do a job, and the second would do it in 30 hours. They worked together for several hours, then the second was recalled, and the first completed the job itself in 5 hours. How many hours did they work together, and how much did
  • Two friends
    clock-night-schr Peter can do all his work himself in 6 hours. Martin can do the same work himself in 8 hours. Peter worked first and then replaced by Martin. Whole work was done in 6.5 hours. Calculate how long Peter worked before replaced by Martin.
  • Part-timers
    jahoda Six part-timers would take seven hours to pick strawberries. How long would this work take if two more temporary workers were added after three hours?
  • Tractors
    tractor 6 tractors started plowing the field that they together take 12 days. Agronomist hesitates to A) after 2 days to withdraw 2 tractors, or B) after 3 days to withdraw 3 tractors. Help him which of these two cases will be plowing done sooner.