Work word problems - page 10 of 43
Number of problems found: 849
- Aircraft engine work
The aircraft weighs 61 tons. It climbed from a height of 1000 m to a height of 3000 m while increasing the speed from 170 m/s to 210 m/s. What work did the aircraft engines do? - Tractor hectare plowing
Tractor drivers plow "h" hectares of land per day. How many hectares of land would they have to plow per day to plow the 585 ha area three days earlier than planned? For which "h" does this problem have a positive solution? - Two buses
On Thursday, 240 skiers had to be transported, and two buses took 30 minutes to do so. If there were 660 skiers on the piste and three buses were used, how long did the transport take on Saturday? - Worker hourly output
Two workers work in a workshop to produce the same product. The first worker worked 184 hours per month and produced 656 pieces of the product. The second worker worked 177 hours per month and produced 830 pieces of products. Calculate the hourly output o - Stone transfer power
At 80 cm above the road, a person transfers a stone weighing 2 kg parallel to it in a uniform motion along a path of 6 m in 10 s. With what power does it work? - Committee election possibilities
5 A students must elect a three-member class committee. However, only 6 pupils out of 30 are willing to work in it. How many possibilities do they have to create it if it does not matter what function the committee member will perform? - Mason shift sickness
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - Cleaner hours extension
The department store originally employed 8 cleaners for reduced working hours of 4 hours a day. When two of them terminated their employment, 6 cleaners agreed to extend their original daily working hours. Specify its length in hours and minutes. - Harvester harvest time
Six identical harvesters were supposed to work on the harvest for 12 days in the agricultural cooperative. After three days, however, two harvesters left for another team. Find how long the harvest time in the farm cooperative has increased. - Workshop order days
In the first workshop, there are 3 workers; in the second workshop, 2 work equally efficiently. They worked on the order together, and for the last 2 days, only workers from the first workshop. If only the first workshop were working, the order would be c - Restaurant waiter guests
The restaurant was fully booked at lunchtime. While only three waiters staffed the restaurant, guests waited an average of 45 minutes for the lunch menu. On average, how many minutes will the guests wait if the three waiters are joined by two more waiters - Bakery worker output
A bakery worker makes 300 rolls more than an apprentice in 2 hours. In 4 hours, they both made 9800 rolls together. What are the hourly output of the worker and the apprentice individually? - Jana Petra windows
Jane can wash 20 windows alone in 4 hours. Petra can do the same job in 6 hours. How long will it take them working together? - Bricklayer student wall
A bricklayer can repair a wall by himself in 30 minutes. His students would take an hour. How long will it take them working together? - Evaluate expression 6
Workout: 5×4-12/2+5 The order of operations is the order you use to work out math expressions: parentheses, exponents, multiplication, division, addition, and subtraction. - Pool inlet filling
We can fill the pool with two inflow pipes. The first pipe fill in 24 hours and the second in 16 hours. How long did the pool fill if the first tube was open for the first 4 hours and then we opened both inlets? - Bricklayer apprentice wall
A bricklayer and an apprentice can build a wall together in 6 hours. Working alone, the bricklayer would finish 5 hours sooner than the apprentice. How long would it take the bricklayer to build the wall by himself? - Delivery scrap percentage
In the first delivery of 120 parts, there was 5% waste. In the second delivery in which, 10% of the 80 were scrapped. How much scrap was brought in with the first and second deliveries combined? What % of scrap was there in both deliveries of parts, out o - Worker addition hours
Six workers will do the work in 8 hours. How many workers must be added if the work is to be completed in 3 hours? - Field sowing days
Farmers had to sow 200 hectares of fields. They reduced the planned sowing time by two days while planting 5 hectares more each day than intended. How many days did the sowing last?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.