Performance 66764
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick.
a) In how many more shifts did the masons complete the said plastering?
b) In how many shifts was the assigned task completely completed?
a) In how many more shifts did the masons complete the said plastering?
b) In how many shifts was the assigned task completely completed?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Plastered 2529
The mason was to plaster 24.2 m² of the wall in 12 shifts. At what percentage did he meet the plan when plastering 306 m² of walls? - Construction 1639
A group of masons had to finish the rough construction within three days. On the first day, they completed a third of this task, but on the second day, they were delayed and did 15% less work than the first day. By what % relative to the second day must t - Two workers
The first worker would complete the work in 8 hours, the other in 6 hours. After two hours of joint work, the worker left the first worker to a doctor, and the others completed the work themselves. How many hours worked did the other worker himself? - Two workers
The first worker completed the task by himself in 12 hours, and the second in 10 hours. After two hours of joint work left, the first worker went to a doctor, and the second finished the job himself. How many hours did the second worker work himself?
- Michael 6
Michael was assigned math problems to complete for his weekly homework. So far, he has completed 28 problems, which is 2/7 of the total number of math problems he was assigned. How many total math problems was Michael assigned for homework? - Assemblers 47483
Two assemblers with the same daily output were to complete the assembly in 12 days. After 4 days, one of them got sick, and the other finished the assembly in another 16 days. How long would it take everyone to do the assembly by themselves? - A contractor 2
A contractor has to complete his contract in 92 days. 234 men were set to do the work, each of them works for 16 hours/day. After 66 days, 4/7 of the work is completed. How many additional men may be employed, so that the work may be completed in time, ea