Work word problems - page 16 of 44
Number of problems found: 867
- Fountain work possibilities
There are seven fountains in the city. Only five always work. How many possibilities do five fountains work at the same time? - Gorilla fruit supply
At the Prague Zoo, they need to know how long the fruit will last for the gorillas. The stock in the warehouse would last the female Kamba for 25 days, the male Richard for 20 days, and the little Nura even for 40 days. How long will the supply last if ev - Suitcase weight
What was the suitcase's weight if I lifted it to a height of 150 cm and did the work 0.5 kJ? - Crane work
The crane lifted a concrete block weighing 3 tons to a height of 500 cm. What work did it do? - Work time
The carpenter did the work in 3 2/5 hours. What part of the work did he do in an hour? - Weighted harmonic average
Ten workers will do some work in 2 minutes, five in 10 minutes, and three in 6 minutes. How many minutes per average worker per worker? - Hydraulic press force
The hydraulic press has pistons with a capacity of 20 cm² and 800 cm². How much force acts on the larger piston if we work on the smaller piston with a force of 100 N? - Bottle closing
One vending machine closes 60 jars per minute, and the other 20 bottles close less simultaneously. If both machines are put into operation simultaneously, in how many minutes will they close 900 bottles? - The sides 3
The sides of an equilateral triangle are 9.4 cm, correct to the nearest decimal place. Work out the upper bound of the side of this triangle. - Mass layoffs
The company's new management has announced that mass layoffs will be necessary due to the poor financial situation. It is estimated that the work that 5 employees did will have to be done by 3 employees. What percentage of the company's employees would lo - Painter hiring
Twelve painters will paint all the rooms in the hotel in 75 hours. How many painters must the operating staff hire when the rooms have to be painted in 60 hours? - Student work percentage
There are a total of 26 students in the class. During the evaluation of the control work, the teacher said: "4 pupils got the number one, and that is 16%. "Did all the students write the control work? - Two xeroxes
The performances of the two copiers are in the ratio of 3:4. A machine with higher power will make 7,200 copies in one hour. How many copies will both machines make together in 5 hours? - Pool pump calculation
The pool for swimmers has dimensions of 25 m, 10 m, and 2.8 m, and the children's pool is only 10 m, 4 m, and 1 m. The pump will change all the water in the swimming pool in 9 hours. How long does it take for the same pump to pump out the water in the chi - Six painters
Six painters paint an area of 120 m² in 4 hours. How long does it take for 12 painters to paint 480 m² with the same performance? - Worker earnings calculation
Twelve workers earned 2,000 euros in 10 days. How many workers would 14 workers earn in 8 days? - Book reading
Susan thought, "If I read 15 pages a day, I will read the whole book in 8 days. "How many pages would she have to read a day if she wanted to finish the book on the 6th day from the start of reading? And how many pages does the book have? - Mr. Ben
Mr. Ben drives bricks to the construction site. If he drove three times a day, he would make bricks in 8 days. How many times a day would he goes every day to be done two days earlier? - Typist page calculation
The typist typed 16 pages of text in 2 hours and 8 minutes. How many pages of text will you write at the same speed in 20 minutes? - Pool nozzle filling
Eighteen nozzles fill the pool in 12 and a half hours. How long does it take for the pool to fill 15 nozzles?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.
