Work word problems - page 26 of 43
Number of problems found: 849
- Two Workers Digging Canal
The first worker digs a canal in 3 hours. The other will dig the trench in 4 hours. They will work 1 hour opposite each other and then together. How long will it take them? - Polder filling
The polder has two tributaries. A larger inflow will fill an empty polder in 12 hours. The polder is already a quarter full. If we open both tributaries, the polder will be filled in 6 hours. How long would it take for a smaller inflow to fill an empty po - Workshops
The first workshop will complete the robot itself in 15 days, and the second workshop in 10 days. They started together, but only the second workshop worked after three days. Thus, the work will take 15 days. - Two pipes
How long will the pool be filled with a double supply pipe if it takes the pool to fill the first pipe by 4 hours long and the second pipe 9 hours longer than both pipes open simultaneously? - Pool pump filling
At the swimming pool, they use three pumps with the same output to fill the pool and fill the pool in 6 hours. How long does it take for the pool to fill nine pumps? - Employees
1116 people are working in three factory halls. In the first one, 18% more than the third, and 60 persons more than the second. How many employees work in individual halls? - Two pumps together
The first pump will fill the tank itself in 3 hours and the second one in 6 hours. How many hours will the tank be full if both pumps are worked simultaneously? - Two friends
Peter can do all his work himself in 6 hours, while Martin can do the same work himself in 8 hours. Peter worked first and was then replaced by Martin, so the whole work was done in 6.5 hours. Calculate how long Peter worked before being replaced by Marti - Three machines
The power of the three machines is 2:3:5. Two most powerful machines produce 400 parts per hour. How many components make all three machines in 3 hours? - Tractors
Wheel and belt tractors each day plow 8 ha of fields. The wheel tractors would have to work to plow 76 hectares for 12 days. Eight days with the belt tractor together. How many hectares do each day of each tractor? - Three pumps
We are filling the pool. The pool would fill the first pump in 12 hours and the second in 15 hours. If all three pumps ran simultaneously, they would fill the pool for 4 hours. How long would the pool fill only with the third pump? - Food weight
Stacie is a resident at the medical facility where you work. You are asked to chart the amount of solid food that she consumes. For the noon meal today, she ate 1/2 of a 3-ounce serving of meatloaf, 3/4 of her 3-ounce serving of mashed potatoes, and 1/3 o - Working together
One worker performs work in 3 days, the second in 5 days. How much do they work together? - Two workers
The first worker would complete the work in 8 hours, the other in 6 hours. After two hours of joint work, the worker left the first worker to a doctor, and the others completed the work themselves. How many hours worked did the other worker himself? - Renovation Work Time
The first company would renovate the complex in 30 hours. Another company would fix it in 20 hours. But the first company left after 5 hours of joint work. How long will it take to renovate the site? - Two Workshops Production Days
Two workshops of a particular company produced 25 parts a day. To have 300 pieces, one worked for ten days and the other for 15 days. How many parts did each workshop make per day? - Construction Material
A smaller car would bring 40 times the material needed for construction, and a larger car 30 times. When the first and second cars had made 12 trips, the smaller car was recalled, and the larger one was to bring the remaining material. How many more roads - Two Inlets Fill Time
The water tank is filled with the first inflow in one hour and 10 minutes and the second in 60 minutes. How many minutes will the tank be half-filled with both inlets if the second outlet is opened 12 minutes later? - Computer task time
In a computer center, one computer would work 12 hours to solve a task, and another, more powerful, would solve the same task for 10.5 hours. If both computers work together, the calculation time would be reduced for a certain period. Calculate how long i - The factory
The factory z can complete an order in 12 days, and factory p can complete it in 18 days. How many days does an order complete when the first two days work only the factory z and then both factories?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.