Three machines
The power of the three machines is 2:3:5. Two most powerful machines produce 400 parts per hour. How many components make all three machines in 3 hours?
Correct answer:
Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Check out our ratio calculator.
Do you want to convert time units like minutes to seconds?
Check out our ratio calculator.
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Calculate 38563
Six equally powerful machines produce 870 parts in 14 hours. Calculate in how many hours 870 parts will have four such machines. - Two machines
The first machine can produce parts in 24 hours, and the second in 16 hours. The first started working at 6:00 pm. Second at 10:00. At what hour all parts were made? - Two xeroxes
The performances of the two copiers are in the ratio of 3: 4. A machine with higher power will make 7,200 copies in one hour. How many copies will both machines make together in 5 hours? - Machines 3358
The first machine was made for hours to watch pieces. The more powerful machine produced 32 more watches in the same period. How many watches would both machines produce together in 3 hours? - Machines
In the workshop are three machines. The first is treated 250 parts for 4.7 hours, the second is treated 300 parts for 1.9 hours, and the third is treated 230 parts for 4.6 hours. How long will it take to make 3100 parts if all three machines are worked si - Assembly parts
Nine machines produce 1,800 parts on nine machines. How many hours will it produce 2 100 parts on seven such machines? - Performance 81586
The performance of three lathes can be expressed by the ratio 3:5:8. The most powerful lathe produces 136 shafts per shift. How many shafts did each of the remaining lathes make per shift? - Production 80661
The production of 4 machines takes a total of 80 hours. They make every machine for the same amount of time. How long does it take to produce 1 machine, 2 machines, or 5 machines? - Machines 2
Two machines for 50 hours produce 2,000 products. How many machines need to buy to make in 30 hours 15,000 products? - Centimeters 3131
111 square centimeters of sheet metal are used to produce one part. How many of the most parts can we make from sheet metal with dimensions of 3 m wide and 0.75 m long? - Grandfather's 5075
They have already produced 2,000 parts in their grandfather's workshop, five-sixths of the plan. How many components should they produce in total? - The machine
The machine works 7 hours daily and produces 1 part in 5 minutes. How many parts will it produce in 1 hour? How many parts will it produce in 1 day? - Components 15751
Two workers produce 138 parts in one shift. At the same time, the first of them produces 30% more than the second. How many components will each have? I need a notation and an equation. Thank you. - Two workers
Two workers make 138 parts/items. The first one produces 30% more than the second. How many items will each produce? - Powerful 29651
The first machine can sow a field in 12 hours. The second, more powerful machine in 8 hours. How many hours was the field sown if workers deployed both machines, but the second machine started working 2 hours later than the first machine? - Workshop
The workshop has to be produced for 5 days 2000 components. How many components must be produced in the workshop daily, and how much per hour if the shift is 8 hours? - Two machines
Performances of two machines are in a ratio of 7:12. A machine with less power produced 406 pieces of products per shift. a) How many pieces are produced per shift second machine? b) How many pieces produced two machines together for five shifts?