Performance 81586
The performance of three lathes can be expressed by the ratio 3:5:8. The most powerful lathe produces 136 shafts per shift. How many shafts did each of the remaining lathes make per shift?
Correct answer:
Tips for related online calculators
Check out our ratio calculator.
You need to know the following knowledge to solve this word math problem:
Related math problems and questions:
- Workman - shift
The worker produces 300 components per shift. How many components would be produced in the 18 shifts if his performance gradually increased every shift by 3 components? - Three machines
The power of the three machines is 2:3:5. Two most powerful machines produce 400 parts per hour. How many components make all three machines in 3 hours? - Components 15751
Two workers produce 138 parts in one shift. At the same time, the first of them produces 30% more than the second. How many components will each have? I need a notation and an equation. Thank you. - Two workers
Two workers make 138 parts/items. The first one produces 30% more than the second. How many items will each produce? - Suppose 4
Suppose that 14% of all steel shafts produced by a certain process are nonconforming but can be reworked (rather than having to be scrapped). Consider a random sample of 200 shafts, and let X denote the number among these that are nonconforming and can be - Probability 37381
The machine produces one part in 2 minutes. The probability that it is defective is 0.05. What probability will the machine produce exactly ten defective parts per shift (8 hours)? - Performance 7682
They produced 8,892 cans in the production hall. Their performance is in the ratio 11:12:13. Which workshop was the hardest, and how many cans did it make? - Two masters
The two masters will make as many parts as five apprentices simultaneously. An eight-hour shift begins at 6 o'clock. When can a master finish the job to produce just as much as an apprentice for the whole shift? - Cuboid
The volume of the cuboid is 245 cm³. Each cuboid edge length can be expressed by an integer greater than 1 cm. What is the surface area of the cuboid? - The percentages in practice
If every tenth apple on the tree is rotten, it can be expressed by percentages: 10% of the apples on the tree are rotten. Tell percent using the following information: a. in June rained six days b, increase worker pay from 500 euros to 50 euros c, grabbed - Produces 6170
The machine produces 2520 parts in 1 hour. How many will they make in 33 minutes? - Performance 5041
Three workers received a reward of €2,850 for their work. They divided them according to their performance so that the first received 20% less than the second and the third received €50 more than the second. How many euros did each person receive? - Strawberries 66884
Marta and Alice bought their children strawberries. They ate most of them, each making pulp from the remaining strawberries. Marta filled her entire cube-shaped container with dimensions 5.2cm, 1dm, and 8.3cm; Alice had a cube-shaped container with an edg - Pumps
Five pumps pumped 1,800 hl of water for 3 hours. How many hectoliters of water pump same two powerful pumps for six hours? - Double-performance 17931
Excavation work was carried out by nine double-performance machines, which excavated 420 meters of excavation in one day. How many were there if the more powerful machine excavated 420 meters in a week (7 days) and the less powerful engine excavated 280 m - Five inlets
The tank can be filled with five equally powerful inlets. If four inlets fill the tank, it takes 30 minutes to fill one-third of the tank. How many minutes does it take to fill an empty tank if it is filled with all five inlets? - Lathe
95% of the components manufactured on the lathe comply with the standard, of which 80% of the components are first-class. How likely can we expect a manufactured part to be first class?