Work word problems - page 24 of 43
Number of problems found: 846
- The work
The work was to be done by 150 workers. At the beginning of their work, The company reduced their number by 40, which increased the work time by 5 and 1/3 of the schedule. How long did the work take? - Three people
Three people start doing work at the same time. The first worked only 2 hours, and the second finished 3 hours before the end. On an individual basis, it would take the first time to do the work 10 hours, the second 12 hours, and the third 15 hours. How m - Pool tiling
The first tiler would cover the inside of the pool in 5 working days, and the second would need seven working days for the same work. In how many days would they line the inside of the pool together? - Drain Holes Reduction
I will drain the whole tub in 4 minutes. How long would it take to drain it if I added two more drain holes? - Four workers
Four workers lay on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take for the remaining three workers to complete their work? - Workers Days Hop Garden
Twenty-four combers combed the hop garden in 6.5 days. How many combers would have to work on combing the hop garden in 5 days? - Company Bonus Gender Percentage
One thousand employees work in the company. At the end of the year, 10% of all men and 20% of all women received bonuses. Thus, the company rewarded 14% of the total number of employees. How many men and women work in the company? - Three Inlets Fill Time
The pool is filled with three identical tributaries in 12 hours. In how many hours will only two tributaries fill it? - Cable Digging People Days
In 12 days, ten people will dig a 3km cable car. In how many days will five people dig it up? - Dividing Money Given Ratio
The company paid three employees 50 euros, 100 euros, and 60 euros. They are to receive a total of 735 euros for further work. How will they divide this amount if it is divided in the ratio as in the first case? - Eight hours
Brigadier Franta ties a sheaf of hay in 20 minutes. Lujza, at the same time, only a quarter. How many sheaves will they tie together in 8 hours? - Lumberjacks
Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if the company added five workers to it after four days? - Ten cashiers
Ten cashiers are open at Tesco. Customers wait an average of 15 minutes. How many other cashiers have to open to reduce the waiting time by 4 minutes? - Book line length
If there were 48 lines 10 cm long on each page, the book would have exactly 100 pages. How many 12cm long lines would be on each page for a book to have 80 pages? - Inlet minus outlet
Water flows into the tank through two pipes and out of the third pipe spontaneously. Pipe A would fill the tank in 3 hours, pipe B would fill in 4 hours, and pipe C would flow out in 12 hours. If all three pipes open simultaneously, how long will the tank - Flowerbed
Ondra digs the bed in 20 minutes, Cuba in 30 minutes. How long do they dig together? - Tony works
Tony works as a welder for a construction company. His hourly wage is $15.51, and he works 40 hours per week. Tony gets paid vacation each year. The construction company is doing well and has plenty of work for the next year. Tony can expect to work the e - Five mechanics
Five mechanics will make a car for some time. How many cars can 30 mechanics produce at the same time? - Teachers Salary Average
A total of 10 teachers work at one small school in Moravia. Their monthly salary is CZK 21,500, CZK 21,800, or CZK 22,500, depending on their education and age. The average monthly salary of a teacher at this school is CZK 21,850. How many teachers of thi - Company and employees
There are 370 employees in the company - women are 15% less than men. How many men work in the company?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.
