Work word problems - page 21 of 44
Number of problems found: 867
- Roofer work completion
Three roofers put the roofing on the roof in 8 days. How long will it take to get two more after three days? - Building construction time
Two workers will build the building in 10 hours. How many hours would they have built the building if three more workers had helped them? - Performance improvement percentage
How much percent performance improvement is needed if the work we have planned for five days has to be managed in three days? - Flowerbed adjustment time
Two students adjust the flower bed in 3 hours. How long will this adjustment take for the pupils if they invite four helpers? - Horse hay calculation
Nine horses need a lot of hay for two days. How many horses would the same amount of hay be enough for three days? - Checkout waiting time
When only three checkouts are open in a supermarket, people wait in line for an average of 10 minutes. How many minutes will the average waiting time in line be if two more checkouts open? - Roofer work completion
Two roofers were to cover the roof in 14 days. After five days, they added one roofer. How long will it take them to complete the work? How many days will it take them to cover? - Tractor plowing calculation
Two tractors are working on plowing the field. If only the first tractor plowed, it would plow the field in 3 hours. The second tractor would plow the field by itself in 6 hours. How long will it take to plow if they work together, but the other starts wo - Inspector passenger calculation
Five inspectors will catch an average of 70 black passengers in 6 days. How many black passengers are caught by nine inspectors in 10 days? - Harvester calculation time
During the harvest, farmers had three combine harvesters available, with which they could harvest the fields in 9 hours. How long will it take if two additional harvesters arrive from a neighbouring farm to help? - A lot of hay
Martin's grandfather weighed a lot of hay and calculated that it would last 100 days for 15 rabbits. How many days will this lot be enough for 25 rabbits? - Corridor plastering time
According to the standard, we calculated that two masons would plaster the corridor of the new school building in 54 hours. How long would it take for nine bricklayers to plaster this corridor? - Harvester wheat calculation
A field of wheat can be harvested by 7 combine harvesters in 5 days at full capacity. The weather forecast called for the harvest to be completed in 4 days. How many combines were needed in total? - Ant food transport
Fifteen ants bring 10 g of food to the anthill in 1 hour. In how many hours will five ants carry 1 kg of food? - Machine production calculation
In the factory, they produced 1,500 products a week on five machines. How many machines do they need to produce 2,000 products a week? - Excavation machine distribution
Excavation work was carried out by nine double-performance machines, which excavated 420 meters of excavation in one day. How many were there if the more powerful machine excavated 420 meters in a week (7 days) and the less powerful engine excavated 280 m - Maid bed making
Six maids make 200 beds in 2 hours. One maid makes 50 beds alone. Then, they all continue together. How long will it take them to make the rest of the beds together? - Reservoir pump filling
The reservoir is filled with the first pump in 30 hours, the second in 24 hours, and the third in 20 hours. How long does it take to fill the reservoir if all pumps are switched on simultaneously? - Room people capacity
The room is 240 cm high and has a volume of 48 m³. How many people can work in it when there is 7 m² of floor space per person? - Flowerbed adjustment time
Six pupils will adjust the flower beds on the school grounds in 2 hours. In how many hours will four pupils change the same flowerbed?
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question.
