Bricklayers 18773
According to the standard, we calculated that two masons would plaster the corridor of the new school building in 54 hours. How long would it take for nine bricklayers to plaster this corridor?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Performance
Two masons with the same performance would have been made of plaster for six days. One of them, however, has increased its daily performance by 50%. How long would it take them now to make plaster together? - Work together
Two bricklayers are plastering a wall. The first would plaster it in 8 hours, the second in 12 hours. How many hours will they be done with the work if they work together? - Bricklayers
Seven bricklayers will build the house in 630 days. How many bricklayers do we need to take after 150 days to complete the building for (additional) 336 days? - Eight masons
Eight masons will plaster a wall with an area of 1440 m² in 9 days. They work 8 hours a day. How much area will plaster six masons in 4 hours?
- Bricklayers
The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and finished the work together. How long did it take to build the wall? - Workers
A Group of workers washed half of the windows of the building in two hours. How long will it take half the workers to wash all the windows of the building? - Performance 66764
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - If Jada
If Jada read 75 pages in four hours, how long would it take her to read 250 pages? - Five tractors
Five tractors plow the field in 4.8 hours. How long would it take to plow this field if, after 1.5 hours of work, two tractors went to a different field?
- Sufficiently 7059
The king gave the mason Václav the task of building a wall 25 cm thick, 50 m long, and 2 m high. If Václav had worked without a break and at the same pace, he would have built a wall in 26 hours. However, according to the valid royal regulations, Wencesla - Two workers
One worker makes a part 4 hours and the second 9 hours later than they would make the same part together. How long does it take for each worker to make the part himself? - A contractor
A contractor wants to plaster Wall, which is 2650 m². He sends 50 masons to do the work equally. What size of the Wall does each Mason plaster? - Tributaries 40641
We would fill the water tank with one inflow in 3 hours and the other inflow in 2 hours. How long will it take for both tributaries to open? - Sprayers
The vineyard can be sprayed first sprayer in 2 hours and with the second in 4 hours. How long would it take if we used sprayers both at once?
- Plastering 6132
Three masons received 44,100 SK for plastering the house. This amount was divided according to the number of hours worked. The first received three times as much as the second, and the second received half as much as the third. Determine in what gradual r - Two looms
On two looms of different performances, the desired amount of fabric can be woven in 6 hours when both are working simultaneously. On the first machine, this amount of fabric would be woven in 10 hours. How long would it take to weave on the second machin - Dispersion 3335
What is the value of the variance of the data in the file if the calculated standard deviation = 2? a) Dispersion = 6 b) Dispersion = 4 c) Dispersion = 9 d) Dispersion = 2