Performance

Two masons with the same performance would have made of plaster for 6 days. One of them, however, has increased its daily performance by 50%. How long would take they now to make plaster together?

Result

t =  4 d

Solution:

Solution in text t =







Leave us a comment of this math problem and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




To solve this verbal math problem are needed these knowledge from mathematics:

Looking for help with calculating harmonic mean? Looking for a statistical calculator? Our percentage calculator will help you quickly calculate various typical tasks with percentages.

Next similar math problems:

  1. Persons
    ball1_6 Persons surveyed:100 with result: Volleyball=15% Baseball=9% Sepak Takraw=8% Pingpong=8% Basketball=60% Find the average how many like Basketball and Volleyball. Please show your solution.
  2. Hectoliters of water
    pumps_7 The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water at the same time?
  3. Painter Pavel
    pixla_s_farbou Painter Pavel painted the fence for 16 hours and painter Petr the same fence painted for 13 h. How long should take painted the fence together?
  4. Painters
    painters The first team of painters would paint bridge in 15 days, the second in 10 days. After 3 days of working together second team goes out and continue only first team. How many days took second team to finish painting the bridge?
  5. 15 teachers
    skola_13 15 teachers teach for a combined amount of 128 days over a period of 64 days. What is this expressed as a percentage?
  6. Highway repair
    truck_6 The highway repair was planned for 15 days. However, it was reduced by 30%. How many days did the repair of the highway last?
  7. Bricklayers
    delnik_4 When a bricklayer works himself to redeem the house in 8 days, the other bricklayer will be finished in 10 days. How long will it take to make 3 such houses together?
  8. Two valves
    pool_2 Water fill the pool by two valves for 11 days. After 7 days the first valve was stopped and the second valve fill pool for 7 days. How many days took to fill the pool each of the valves individually?
  9. Frameworks is bad
    space Calculate how many percent will increase the length of an HTML document, if any ASCII character unnecessarily encoded as hexadecimal HTML entity composed of six characters (ampersand, grid #, x, two hex digits and the semicolon). Ie. space as:  
  10. Theorem prove
    thales_1 We want to prove the sentence: If the natural number n is divisible by six, then n is divisible by three. From what assumption we started?
  11. Summerjob
    tree2 The temporary workers planted new trees. Of the total number of 500 seedlings, they managed to plant 426. How many percents did they meet the daily planting limit?
  12. Percentage increase
    percent_31 Increase number 400 by 3.5%
  13. Percents
    percents2_10 How many percents is 900 greater than the number 750?
  14. Percentages
    permutations_3_3 52 is what percent of 93?
  15. Profit gain
    percent_12 If 5% more is gained by selling an article for Rs. 350 than by selling it for Rs. 340, the cost of the article is:
  16. The ball
    ball1_4 The ball was discounted by 10 percent and then again by 30 percent. How many percent of the original price is now?
  17. Minute average
    workers_40 In a factory, four workers are assigned to complete an order received for dispatching 1400 boxes of a particular commodity. Worker A takes 4 mins per box, Worker B takes 6 minutes per box, C takes 10 mins per box, D takes 15 mins per box. Find the average.