Assemblers 47483
Two assemblers with the same daily output were to complete the assembly in 12 days. After 4 days, one of them got sick, and the other finished the assembly in another 16 days. How long would it take everyone to do the assembly by themselves?
Correct answer:

Tips for related online calculators
Looking for calculator of harmonic mean?
Looking for a statistical calculator?
Do you have a system of equations and are looking for calculator system of linear equations?
Do you want to convert time units like minutes to seconds?
Looking for a statistical calculator?
Do you have a system of equations and are looking for calculator system of linear equations?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
statisticsalgebraUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Sick colleague
All the classrooms at school were painted during the holidays. On the first day, 6 painters did one sixth of the required work. From the second day until the painting was finished, only 5 painters worked because one of them got sick. All the painters work
- Peter 13
Peter and Paul finished the first round of orders in 3 hours and 15 minutes. Peter, however, works a lot faster than Paul does; Peter is 2 and a half times as fast as Paul. For the second day of shipping orders, peter is unavailable; paul will have to do
- Complete 19783
Two roofers were to cover the roof in 14 days. After five days, they added one roofer. How long will it take them to complete the work? How many days will it take them to cover?
- Performance
Two masons with the same performance would have been made of plaster for six days. One of them, however, has increased its daily performance by 50%. How long would it take them now to make plaster together?
- Painters 5
Six painters were supposed to paint 6000 m² of area within the planned time. Two painters got sick, so each of the four who remained had to paint 50 m² more each day than the planned daily output. Calculate the original planned daily output of one painter
- Six workers
Six workers planned to repair the roof in 5 days. After two days, two workers get sick. How long will the remaining workers complete the roof at the same rate?
- Together 7332
One tractor driver would mow the field in 15 hours. Another tractor driver would do the same job in 12 hours. How long will it take them to do the work together if the latter starts plowing two hours later than the former?