Average time
Determine the weighted average time required in minutes per product, given that 6 workers each take 8 minutes, 15 workers each take 12 minutes, 5 workers each take 10 minutes, and 9 workers each take 13 minutes.
Final Answer:

Tips for related online calculators
Looking for help with calculating arithmetic mean?
Looking for a statistical calculator?
Do you want to convert time units like minutes to seconds?
Looking for a statistical calculator?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
statisticsUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Weighted harmonic average
Ten workers will do some work in 2 minutes, five in 10 minutes, and three in 6 minutes. How many minutes per average worker per worker? - Minute average
In a factory, four workers are assigned to complete an order received for dispatching 1400 boxes of a particular commodity. Worker A takes 4 minutes per box, Worker B takes 6 minutes per box, C takes 10 minutes per box, and D takes 15 minutes per box. Fin - Product Cost Weight Distribution
If you know that the company produces four similar products that differ only in the weight of the packaging, determine the final price of the product in terms of costs. The total cost of manufacturing the product was CZK 5,745,000. And 10 kg 15,000 pcs B - Motorcycle speed
Determine the average speed of a motorcycle ridden 1/3 of the total ride speed at 30 m/s and 2/3 of the total ride speed at 15 m/s. - Kerosine and petrol
If 4 liters of petrol containing 15% kerosine are added to another 7 liters of petrol containing 10% kerosine, what percentage of the petrol is kerosine? - Bio-yoghurt
Determine the production and selling price of the product (bio-yoghurt). Number of units produced: 1500 pcs/day Number of working days: 22/month Number of workers: 4 employees (average wage: 820 Eur) Rental costs: 60 500 Eur/year Price of promotions: 2120 - Phone call probability
One hundred people work in the office. Each of them spends an average of 25 minutes daily on the phone. A working day has 8 hours. What is the probability that ten workers will be on the phone simultaneously in one day?
