Statistics - math word problems - page 28 of 39
Number of problems found: 771
- Water mixing
We have 520 ml of hot water and 640 ml of water at 48°C. What is the temperature of approximately hot water when the resulting mixture has a temperature of 65°C? - Boots
Master shoemaker has three apprentices. First, do one pair of boots for two days, second for one day, and third for 1.5 days. How long would it take to make a couple of boots if they worked together? - Construction 7709
Two construction companies are working on the landscaping. The first would do the whole job in 12 days, the second in 20 days. How long will they work together if the first start working when the second has already worked 4 days? - Average speed
The car drove from city A to city B at 40 km/h and back to city A at a speed of 80 km/h. What was the average speed of the car?
- Probability - coin toss
A coin is tossed 24 times. Find the probability of getting 16 heads. (The probability of getting a head is 0.5) - Distribution function
X 2 3 4 P 0.35 0.35 0.3 The data in this table do I calculate the distribution function F(x) and then probability p(2.5 < ξ < 3.25) p(2.8 < ξ) and p(3.25 > ξ) - Minutes 8081
I will drain the whole tub in 4 minutes. How long would it take to drain it if I added two more drain holes? - Three pumps
We are filling the pool. The pool would fill the first pump in 12 hours and the second in 15 hours. If all three pumps ran simultaneously, they would fill the pool for 4 hours. How long would the pool fill only with the third pump? - Calculation 7334
In a computer center, one computer would work 12 hours to solve a task, and another, more powerful, would solve the same task for 10.5 hours. If both computers work together, the calculation time would be reduced for a certain period. Calculate how long i
- Simultaneously 17821
The reservoir is filled with the first pump in 30 hours, the second in 24 hours, and the third in 20 hours. How long does it take to fill the reservoir if all pumps are switched on simultaneously? - Truncated 43851
The pit has the shape of a regular truncated 4-sided pyramid, the base edges of which are 14m, 10m, and the depth is 6m. Calculate how many m³ of soil were removed when we dug this pit. - There
There is 5 l of water with a temperature of 20°C in the bucket. We add 3 liters of hot water. The resulting temperature will be 30°C. What was the temperature of the hot water? - The pool
The pool contains 220 m³ of water. Workers can empty the pool either: a) 10 hours of pipe B and 8 hours of pipe A, or b) 10 hours of pipe A and 7 hours of pipe B. How many cubic meters of water will flow in 1 hour from pipe A, and how many from pipe B? - In and out
The empty tank is filled in 12 minutes and empty in 16 minutes. How long does it take to fill if we forget to close the drain? The tank has 1000 liters of volume.
- Together 83245
Jarka and Jana decided to decorate their common room. If Jarka painted it alone, it would take her 4 hours, and Jane 3 hours. How long would they paint the room if they painted together? - Kilometers 7684
My father went to dig 6 kilometers of beet at 6:00 pm. It would take him 12 hours. After an hour, the son arrived, and they finished digging at 10:00. How long would it take to dig 6 km of beet for his son? - Distribution 81063
The weight of a loaf of bread should be 900 g. Loaves whose weight differs by more than 30 g from this value must be rejected. Determine the probability that a loaf is rejected if its weight has a normal distribution N(900,40). - Deficiencies
The hygienic inspection of 2000 mass caterers found deficiencies in 300 establishments. What is the probability that flaws in a maximum of 3 devices will be found during the inspection of 10 devices? - Average speed
The truck drove 1/2 of the way on the highway at 80km/h. The other half of the way, 20km/h. Calculate the average speed
Do you have homework that you need help solving? Ask a question, and we will try to solve it.