Time - math word problems - page 21 of 161
Number of problems found: 3218
- To the city
A bus leaves for a city 54 km away at an average speed of 15 m/s. 12 minutes after the bus leaves, a motorcycle leaves from the same place to follow it. Calculate the average speed of the motorcycle when it arrives at the destination at the same time as t
- Tractor 17
The tractor has an average speed of 2.4 km/h in the first minute of starting, 3.6 km/h in the second and third minutes, and 5.0 km/h in the fourth to sixth minutes. What movement did it make during the first six minutes of driving? Determine the average s
- Isosceles
A flower bed has the shape of an isosceles triangle with a base of 25m and sides of 30m. Calculate the maximum number of flowers that can be planted in this bed, assuming that one flower requires about 8 dm² of square area. Round the result to the nearest
- Interest 83990
The deposit is €1000. The interest is 7.36% per year. What is the amount after 3 years and 9 months?
- Fraction 83957
Write as a fraction in basic form: What part of a day is one hour?
- Chord and radius
Calculate the radius of a circle whose chord XY is 8 cm long and whose center is 3 cm from the chord.
- Timetable
If a train traveling between two cities increases the speed specified in the timetable by 5 km/h, it will arrive 20 minutes earlier. If it decreases it by 5 km/h, it will arrive 25 minutes later. How long is the route between the cities?
- 23 students
The ninth grade students went on a field trip in such a number that they could sit at tables of 4, 5, and 6, and each time one seat remained free. What is the smallest number of students who participated in the field trip?
- In a right triangle 13
The height of the hypotenuse is 4.8cm. The hypotenuses are in the ratio 4:3. Calculate the perimeter and area of a triangle.
- Paving 2
It will take a construction company 8 working days to pave the sidewalks on two streets in a city if all 6 pavers work. However, only 4 pavers can complete the job because the other two have been dismissed. How many working days will it take the group of
- Shadow - an observation tower
How tall is the observation tower if it casts a shadow 9.6 m long at exactly the same moment that a half-meter pole casts a shadow 30 cm long?
- Didactic test B0
A tourist cycled 28 km on an asphalt road and 25 km on a dirt road, which took 3 hours 36 min. At what speeds did the tourist travel the individual sections of the road if he rode 1.4 times faster on the asphalt road than on the dirt road?
- Calorimetric equation
A 200g aluminum cylinder at 180°C was dropped into 3kg water at 25°C. At what temperature did the resulting temperature stabilize? The specific capacity of water is 4200 J/kg °C, aluminum 896 J/kg °C,
- Elevator efficiency
To what height will an elevator motor with a power of 25 kW and an efficiency of 48.6% transport a cabin weighing 445 kg with seven people (the average weight of one person is 64 kg) if it takes 54 seconds?
- Standard
What will be the speed of a two-pole synchronous motor connected to a standard network with a frequency of 50Hz? In revolutions per minute.
- Weighing 83881
From what height did a body weighing 9.8 kg fall if it hit the surface at a speed of 100 km/h?
- Minutes 83870
How many minutes is five-sixths of half an hour?
- Motor efficiency
Calculate the power input of a motor operating at an efficiency of 58% that will lift an elevator car (weighing 390 kg) with twenty boxes (each 25 kg) to a height of 85 m in 29 seconds.
- Acceleration - gravity
What is the gravitational constant (acceleration) if a body with a mass of 5.8 kg fell from 68 meters and hit the ground at a speed of 60 km/h?
- Borrowed
Mr. Douda borrowed 200,000 SK from the bank at an annual interest rate of 15.4%. He will repay the loan after four years. How many korunas will he have to repay?
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question.