Work word problems - page 11 of 40
Work Problems are word problems that involve different people doing work together but at different rates. Another problem involves pipes filling up a tank. Another name for these problems is working together word problems.We suggest solving working together word problems with the proportion. If we can complete a task in t hours, we can complete 1/t of the task in one hour.
Number of problems found: 781
- Treatment 46571
They have 3 sprayers for the chemical treatment of the vines. The first would spray the vineyard in 12 hours, the second in 15 hours, and the third in 10 hours. How long would it take to spray the vineyard with all the sprayers combined? - Latent heat
How much heat is needed to take from 100 g of water at 20°C to cool to the ice at -18°C? Mass heat capacity c (ice) = 21kJ/kg/°C; c (water) = 4.19 KJ/kg/°C and the mass group heat of solidification of water is l = 334kJ/kg - Deadline
Five equally skilled masons built half the wall in 14 days. They must build the remaining part in 6 days to catch the planned deadline. How many more masons need to be allocated for construction? - Together 46221
Jeníček and Ferek brigade together. They divided the work in a ratio of 4: 6. Ferko was paid 24 euros. How many euros did they earn together?
- Harvesting 45961
The father would pick all the apples himself in 8 days. After two days, the son also started harvesting, and after another four days, they finished harvesting. How much would his son pick all the apples for? - Performance 45861
The electric motor with a power input of 25 kW works with an efficiency of 80 percent. He will do the work in 6 hours. What is the performance, and what part of the work is the loss? - Jewelry factory
In a jewelry factory, three assemblers make beaded necklaces. Marcus can make 22 necklaces per hour all day long. Anita can make 25 necklaces for her first three hours of the day and then slow down to 16 necklaces for the rest of the day. Yara can make 2 - Workshops
The plant has three workshops. In the first workshop, produce five products/hour. In the second 8 products/hour, and in the third, seven products/hour. In the first workshop, they produced 240 products. In the second 400 and the third 350 products. Find t - Designated 44741
Cathedral height 110m, sphere weight 6000kg, dome diameter 43m, crane arm length 25m a) what was the diameter of this sphere? b) how much mechanical work had to be done to lift it to the designated place?
- Transmission 44701
The electric field performs work 1610 J in the transmission of electric charge of 7 Coulombs between the heating coil terminals. Calculate the voltage between the terminals. - Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk? - Carpenters 44401
Eight carpenters will make 30 chairs in 2 days. In how many days will ten carpenters make 72 chairs? - Identical 44271
Ten identical trucks will take 240 tons of concrete to build the dam in 3 working days. How many tons of concrete will seven trucks take to make the dam in 5 days? - Painters 44121
Two painters will paint the bridge in 12 days. How many painters must we employ if we need to paint the bridge in 8 days?
- Efficient 43461
Four workers were supposed to build 200m of the fence in 15 days. However, after 3 days, two more workers came to their aid. All workers were equally efficient. Calculate how many meters of the fence (from the original 200m) remained after the first 3 day - All tasks - taskman
Skilled workshop master washes client car 1/5 hour, cleaned the client's car in 5/4 hour, and painted small defects on car 1 1/3 hour. How long did it take him to do all the necessary work tasks? - Michael 42461
Michael will read the book in 8 days if she reads 15 pages daily. How many pages does she have to read per day if she wants to finish the book six days after the start of reading? How many pages does the book have? - Seamstresses 42451
Eight seamstresses will make the order in 15 shifts. How many will be sewists if they have to complete an order three shifts earlier? - The pet
Ananya has a bunny. She bought 4 7/8 pounds of carrots. She fed her bunny 1 1/4 pounds of carrots the first week. She fed her bunny 5/6 pounds of carrots the second week. Altogether, how many pounds of carrots did she feed her bunny? 1. Draw a tape diagra
Do you have homework that you need help solving? Ask a question, and we will try to solve it.