Three men
If three men can do a job in 8 days, how many men can do the same job in 6 days?
Correct answer:

Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- 3 men
Three men painting a house take 7 1/2 days. How long will 5 men take over the same job? Working at the same rate.
- 7 men
Seven men can complete work in 52 days. How many days will 13 men finish the same work?
- Five people
Five people can finish painting a wall in 4 hours if only two people are available. How many hours do they have to work to finish the same job?
- Jerrie
Jerrie can repair her car in 1 1/12 hours. A mechanic can do the same job in 8/12 hours. How much longer does it take Jerrie to do the job?
- Welders
The welder does the job for six hours, the second one for 8 hours. How long do the job third welder, if all together can do the job in 2 hours?
- Twenty-seven 3476
Twenty-seven workers did the work in 12 days. In how many days would nine workers do the same job?
- Including 70264
A group of six, including at least three women, is selected from seven men and four women. Find how many ways we can do this.
- Two workers
Two workers will do certain work for 12 days. After eight days of working, one was removed, and the other finished the job alone in 10 days. For how many days would you do this work alone for each worker?
- Workers
Two workers would fulfill a certain task when working together for 5 days, the first if he worked himself done work in 13 days. How many days will the second worker do the whole job?
- Workers 54253
Four workers packed the goods with the same output in 6 hours. In how many hours would five workers do the same job? Express it in hours and minutes.
- Apprentices 30051
Four apprentices worked on a glove order for 20 days. How long would it take for eight apprentices to complete the contract in the same job?
- Shoemaker
Both the shoemaker and his apprentice repaired his shoes. The apprentice worked for six days and repaired ten pairs of shoes daily. The shoemaker did the same job for four days. How many pairs of shoes did the shoemaker repair per day?
- Embankment 56451
Twenty men will build a dam in 36 days if they work 10 hours daily. How many hours a day do 30 men have to work if the embankment is to be completed in 16 days?
- Painters 4
One painter will do the job for 12 days. After a 4 1/3 day, he comes second to help him complete work together for eight days. How long would work the second painter himself?
- 10 workers
Ten workers will perform the assigned work in 8 days. How long will it take to get the job done if six workers work for six days, and then another six join them?
- Wall builders
If 12 men can build a wall 398 meters long in 48 days, how long would it take 33 men to build a wall 347 meters long? Answer to 3 decimal places.
- Together
If eight men, ten women, and 16 children collect ₹1024 in 4 days, how many days will be required for six men, five women, and four boys to collect ₹768? (₹ is Indian Rupee)