3 men
Three men painting a house take 7 1/2 days. How long will 5 men take over the same job? Working at the same rate.
Correct answer:

Tips for related online calculators
Need help with mixed numbers? Try our mixed-number calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebranumbersUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Insulating a house
Five workers are working on insulating a house at such a pace that they could finish the job in 18 days. After three days of work, two workers were called away to another construction site. In how many days will the remaining workers finish the job?
- Working together
Zeru can complete a certain job in 5 days, and Tulu can complete the same job in 3 days. How long will they complete the job if they work together?
- Working group
20 men complete one-third of a piece of work in 20 days. How many more men should be employed to finish the rest of the work in 25 more days?
- The restaurant
The restaurant is 3/8 miles from the office. She makes the walk in 7 1/2 minutes. At the same rate, how long will it take her to walk the two miles from her home to her office?
- Together 82970
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the fi
- Manday, manhour
Job problem: 10 men can make 20 toys in 12 days working 12 hours a day.Then, in how many days can 24 persons make 32 toys working 16 hours a day?
- Three men
If three men can do a job in 8 days, how many men can do the same job in 6 days?