Together 82970
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the first?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Together 8086
The first tiler would cover the inside of the pool in 5 working days, and the second would need seven working days for the same work. In how many days would they line the inside of the pool together? - Together 7332
One tractor driver would mow the field in 15 hours. Another tractor driver would do the same job in 12 hours. How long will it take them to do the work together if the latter starts plowing two hours later than the former? - Tractors 19713
Two tractors are working on plowing the field. If only the first tractor plowed, it would plow the field in 3 hours. The second tractor would plow the field by itself in 6 hours. How long will it take to plow if they work together, but the other starts wo - Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker next half of the work, it will take 25 hours. How long would it take to job them separately?
- Complete 2833
The tiler covered 3/5 of the wall with tiles in two hours and 45 minutes. How long did it take to complete the entire lining area at the same power? How long did the whole job take him? - Two workers
One worker makes a part 4 hours and the second 9 hours later than they would make the same part together. How long does it take for each worker to make the part himself? - Soda bottles factory
Two different filling machines fill soda bottles to order. If the first machine worked alone, it would need a third less time to complete the order. How long would it take each machine to complete the job independently if the faster machine worked for 96 - Digging
The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together? - Workers
Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job?
- Planting 27201
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f - Construction 7709
Two construction companies are working on the landscaping. The first would do the whole job in 12 days, the second in 20 days. How long will they work together if the first start working when the second has already worked 4 days? - Reconstructing 23991
Three groups take turns reconstructing one piece of highway. The first group would finish the job themselves in 40 working days. The second group is in 24 working days, and the third group is in 30 working days. How many days do you do it together? - Two looms
On two looms of different performances, the desired amount of fabric can be woven in 6 hours when both are working simultaneously. On the first machine, this amount of fabric would be woven in 10 hours. How long would it take to weave on the second machin - Two workers
One worker needs 40 hours to do a job, and the second would do it in 30 hours. They worked together for several hours, then the company recalled the second, and the first completed the job in 5 hours. How many hours did they work together, and how much di
- Turners
Two turners perform joint work in 3 hours. The first-turner would perform the job himself in 7 hours. How long would the same job last for a second-turner if he worked alone? - Engineering 54971
Two engineering companies have the same production program. The first company would fulfill their orders in 20 days. The second company in 16 days. How long will the companies fulfill the order if the first company starts working 2 days earlier? - Tractors
Two tractors plow the field for 4 hours together. If the first tractor plowed half of the field and then the second tractor completed the job, it would take 9 hours. How many hours does the field plow for each tractor separately?