Soda bottles factory
Two different filling machines fill soda bottles to order. If the first machine worked alone, it would need a third less time to complete the order. How long would it take each machine to complete the job independently if the faster machine worked for 96 minutes and the slower machine worked for two hours longer?
Correct answer:
Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Apprentices 30051
Four apprentices worked on a glove order for 20 days. How long would it take for eight apprentices to complete the contract in the same job? - Together 39671
Three workers were to lay the parquet floor. If everyone worked alone, the first would finish the job in 30 hours, the second in 24 hours, and the third in 20 hours. How long will they do the floor if they work together? - Turners
Two turners perform joint work in 3 hours. The first-turner would perform the job himself in 7 hours. How long would the same job last for a second-turner if he worked alone? - Together 82970
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the fi
- Simultaneously 3157
The first machine closes 65 closing bottles per minute. The second machine closes five bottles less at the same time. How many minutes will both machines close 2,500 bottles if they work simultaneously? - Technical 2617
Pupils work in groups of two on technical work in the school to make a birdhouse. If Tomáš worked alone, he would make the booth in 4 hours. Richard would do it in 2 hours. If they work together, how many hours will it take them to complete it? - A report
Maricris can type a committee report in 5 hours. Jane helped Maricris, and together they finished the report in 3 hours. How long would it take Jane to complete the report she had worked on alone? - Machines
In the workshop are three machines. The first is treated 250 parts for 4.7 hours, the second is treated 300 parts for 1.9 hours, and the third is treated 230 parts for 4.6 hours. How long will it take to make 3100 parts if all three machines are worked si - 2 pipes
Two pipes can fill a tank in 35 minutes. The larger pipe alone can fill the tank in 24 minutes less than the smaller pipe. How long does each piece take to fill the tank alone?
- Independently 3874
Josef would do the work himself in 5 hours. Josef and Michal would do the work together in 3.5 hours. Determine how long it would take Michal to do the job independently. - Everyone 4572
Two workers completed the work in 12 days. If the other worked ten days longer than the first, how long would everyone work alone? - Construction 64524
The bricklayer and the apprentice will build the wall in 6 hours. If the bricklayer worked alone, the wall construction would take him 5 hours shorter than the apprentice. How long before the wall would the bricklayer build himself? - Two looms
On two looms of different performances, the desired amount of fabric can be woven in 6 hours when both are working simultaneously. On the first machine, this amount of fabric would be woven in 10 hours. How long would it take to weave on the second machin - Work
The first worker would need less than 4 hours to complete the task than the other worker. In fact, both workers worked for two hours together. Then the first worker did the remaining work himself. In what proportion should the remuneration of the workers
- Three workers
Three workers, A, B, and C, have to work on a specific task. Workers A and B completed the task in 12 days, B with C for 19 days, and A with C for 24 days. How long would it take to complete the task for everyone alone? How long would it take to complete - Bricklayers
The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and finished the work together. How long did it take to build the wall? - Simultaneously 35163
One vending machine closes 60 jars per minute, the other 20 bottles less simultaneously. In how many minutes will both machines close 900 bottles if they are put into operation simultaneously?