Work word problems - page 6 of 43
Number of problems found: 842
- Shifts 82622
Four trucks will move the pile in 25 shifts. How many cars are needed to reduce the time by 2:5?
- Efficient 82615
Six maids in a hotel make 200 beds in 2 hours. Calculate how long five equally efficient maids would take to make these beds. Enter the result in minutes. Calculate how long three equally efficient maids would take to make 100 identical beds. Express the
- Two 2
Two different harvesters harvested potatoes with an area of 6.6 ha in one shift when they were operating simultaneously. The area of land from which the less powerful harvester was able to harvest potatoes in six shifts, the more powerful harvester in
- Roofers 82541
Three roofers cover a third of the roof in 10 days. In how many days would 5 roofers cover the entire roof at the same rate?
- Remaining 82419
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job?
- Construction 82411
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks?
- Expedition 82407
Food for 56 sailors would last 32 days. How long did the food supplies last the expedition if 14 castaways were taken on board after 12 days of sailing?
- Woodcutters 82406
Fifteen loggers would take 12 days to clear a large field. How many days did this work require, if 5 more woodcutters were transferred to them after 4 days of work?
- Complete 82405
8 masons build a house in 630 days. How many masons must we add after 150 days to complete the whole house in 320 days?
- Reassigned 82404
Five grinders grind 120 products in 12 hours. After 4 hours of work, another 11 grinders were reassigned to the workshop. Will he complete the entire job in 6 hours?
- Seamstresses 82403
Eight seamstresses sew an order in 85 hours. After 21 hours, 3 seamstresses had to leave for other work. In how many more hours will the order be fulfilled? How many hours did the whole job take?
- Powerful 82250
In 5 minutes, it pumps 1240 l of water with the pump. Can two equally powerful pumps pump 500 liters of water in 1 minute?
- One-twentieth 82239
Peter and Honzo decided to build the building as quickly as possible. They built one-twentieth of the building in ten minutes. After 20 minutes, three more friends joined. Everyone was building at the same pace. How many minutes did it take to build the s
- Excavators 82208
Two excavators dig a pit in 12 days. How much shorter will this job take if 8 excavators dig the hole? In 3 or 9 days?
- Because of
Due to the large potato harvest this year, the farm bought a new, more powerful sorter in addition to the old one. Now both machines work simultaneously, and therefore the daily harvest is processed in 12 hours. If only the old machine were working, it wo
- Horizontal 82197
A cyclist rides along a horizontal path at a constant speed, overcoming a total resistance force of 20 N. What work does he do on a 5 km track?
- Supply 82149
The water supply is enough for 12 horses for 16 days. How many horses will this supply of water last for 12 days?
- Distribute 82137
We have a profit of 40000e, and the work took 30 days. The first worker is promised 38% of the profit but only works for 15 days, the second worker is promised 33% of the profit and works for 20 days, and the third is promised 28% of the profit and works
- Together sewing
Eva sews a costume in 6 hours, Ivana in 8 hours, and Monika in 4 hours. How long will it take them to make the costume if they work together?
- Afforestation 81997
During afforestation, two workers planted 80 seedlings in 2 hours. At the same output, how many seedlings did 6 workers plant in 5 hours?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.