Remaining 82419
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Workers
Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job? - Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk? - Planting 27201
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f - Performance 31371
According to the plan, seven pavers were to pave the square in 14 days. After two days of work, another 5 pavers came to help them. How many days from the arrival of the pavers will the work be completed? (tile performance is the same)
- 20-meter-long 39603
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk: a) 4 workers b) 5 workers c) 10 workers - Friends 81769
Four guys would finish washing cars at a gas station in 4 hours. After one hour, two more friends come to help them. How long will it take to finish the car wash? - Together 7332
One tractor driver would mow the field in 15 hours. Another tractor driver would do the same job in 12 hours. How long will it take them to do the work together if the latter starts plowing two hours later than the former? - According 17163
According to the standard, seven tiles can pave the sidewalk in 12 shifts. After three shifts, one worker went on holiday. In how many shifts were the sidewalk paved? - Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker next half of the work, it will take 25 hours. How long would it take to job them separately?
- Four pavers
Four pavers would pave the square in 18 days. How many pavers do you need to add to the done work in 12 days? - Four painters
The company sent four painters to paint the school. They should be done in 12 days. After three days, one painter got ill. How long will the remaining painters paint the school? - Together 82970
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the fi - Our house
Our house would paint by four painters in 14 days. How long could it paint five painters? How long will it take if two other painters come to help after five days? - Modifications 3317
Workshop A can fulfill a specific order in 8 changes, workshop B in 10 modifications. How many shifts will the job be completed if workshop A works on only the first two shifts and both workshops work on the remaining shifts?
- Reconstructing 23991
Three groups take turns reconstructing one piece of highway. The first group would finish the job themselves in 40 working days. The second group is in 24 working days, and the third group is in 30 working days. How many days do you do it together? - Painting rooms
If Daniel paints for three hours daily, he completes it in 7.5 days. How many hours a day would he have to work to finish the job 1.5 days earlier? - Workers
Two workers, A and B, will be done work together for 15 days. They worked together for 13.5 days. Then A worker became ill, and worker B finished the job alone for 7.5 days. If every worker was working alone, how many days took the whole work for workers