Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk?
Correct answer:
Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- 20-meter-long 39603
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk: a) 4 workers b) 5 workers c) 10 workers - Remaining 82419
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job? - Granite sidewalk
On the sidewalk, 3 m wide and 8 m long, 2 m³ of mosaic stone (granite cubes) was used. The master of tiles had to pave the sidewalk 2.5 m wide and 65 m long. How much m³ of the stone does it consume? - Performance 31371
According to the plan, seven pavers were to pave the square in 14 days. After two days of work, another 5 pavers came to help them. How many days from the arrival of the pavers will the work be completed? (tile performance is the same)
- Rectangular 18333
The rectangular pool has dimensions of 10.5m and 8m. There is a 1m wide trail around it. How many m² of tiles are needed to pave the sidewalk? - According 17163
According to the standard, seven tiles can pave the sidewalk in 12 shifts. After three shifts, one worker went on holiday. In how many shifts were the sidewalk paved? - In the
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. How many m² of pavement will be laid with tile - Sidewalk
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. In the picture, the sidewalk is shown in gray. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. - Rectangular 83244
The rectangular pool has dimensions of 25 meters and 12.5 meters. A 2-meter wide path surrounds the pool. How many square meters of tiles are needed to pave a sidewalk?
- Four pavers
Four pavers would pave the square in 18 days. How many pavers do you need to add to the done work in 12 days? - One press
One press will produce one truck of respirators in 3.5 days. The second in 10 days. How long does it take to fill a truck while working together? - Sidewalk
Casey has 5/6 left of a section of sidewalk to clean. If he can clean 5/18 of a section in 1 minute, how long will it take him to clean what is left? - Maximally 4036
Mr. Novák wants to pave the terrace with tiles of two sizes to be as small as possible. Its terrace is square with a side 3 meters long. There is a wall of the house on two sides of the terrace. Next to the wall, he wants to put small tiles, the rest larg - Workers
Ten workers must pave road street for 22 working days. After four days were for speeding up work, added two more workers. a) After how many work days now workers complete the paved road? b) How many working days does a total paved road take?
- Complete 2833
The tiler covered 3/5 of the wall with tiles in two hours and 45 minutes. How long did it take to complete the entire lining area at the same power? How long did the whole job take him? - Harvesters 4498
The first combine harvester will harvest the fields in 12 hours, and the second combine harvester in 8 hours. How long does it take for the same harvester to harvest the 3rd combine if all three harvesters harvest together in 2 hours? - Apprentices 30051
Four apprentices worked on a glove order for 20 days. How long would it take for eight apprentices to complete the contract in the same job?