Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk?
Final Answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
basic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Granite sidewalk
On the sidewalk, 3 m wide and 8 m long, 2 m³ of mosaic stone (granite cubes) was used. The master of tiles had to pave the sidewalk 2.5 m wide and 65 m long. How much m³ of the stone does it consume? - Sidewalk paving time
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk: a) 4 workers b) 5 workers c) 10 workers - Pool sidewalk tiles
The rectangular pool has dimensions of 10.5 m and 8 m. There is a 1 m wide trail around it. How many m² of tiles are needed to pave the sidewalk? - Paver square shifts
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job? - Paving 2
A construction company needs 8 working days to pave the pavements on two streets if all 6 pavers work. However, only 4 pavers are available because the other two have been reassigned. How many working days will it take the group of 4 pavers to complete th - Square paving calculation
According to the plan, seven pavers were to pave the square in 14 days. After two days of work, another 5 pavers came to help them. How many days from the arrival of the pavers will the work be completed? (tile performance is the same) - Sidewalk paving calculation
According to the standard, seven tiles can pave the sidewalk in 12 shifts. After three shifts, one worker went on holiday. In how many shifts were the sidewalk paved?
