20-meter-long 39603
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk:
a) 4 workers
b) 5 workers
c) 10 workers
a) 4 workers
b) 5 workers
c) 10 workers
Correct answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk?
- Diggers
The excavation was carried out in 4 days, and five workers worked on it for 7 hours daily. Determine how long it would take to excavate if seven workers worked on it 8 hours a day.
- Remaining 82419
Seven pavers would pave the square in 15 shifts. After five shifts, two pavers fell ill. How long will it take for the remaining pavers to finish the job?
- Planting 27201
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f
- Sidewalk
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. In the picture, the sidewalk is shown in gray. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters.
- In the
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. How many m² of pavement will be laid with tile
- Workers
Ten workers must pave road street for 22 working days. After four days were for speeding up work, added two more workers. a) After how many work days now workers complete the paved road? b) How many working days does a total paved road take?
- Our house
Our house would paint by four painters in 14 days. How long could it paint five painters? How long will it take if two other painters come to help after five days?
- Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker next half of the work, it will take 25 hours. How long would it take to job them separately?
- 10 workers
Ten workers will perform the assigned work in 8 days. How long will it take to get the job done if six workers work for six days, and then another six join them?
- Three workers
Three workers, A, B, and C, have to work on a specific task. Workers A and B completed the task in 12 days, B with C for 19 days, and A with C for 24 days. How long would it take to complete the task for everyone alone? How long would it take to complete
- Distribute 6298
Sixteen employees will distribute leaflets in 12 days. How long will it take if, after four breaths, six workers go to work elsewhere?
- Rectangular 18333
The rectangular pool has dimensions of 10.5m and 8m. There is a 1m wide trail around it. How many m² of tiles are needed to pave the sidewalk?
- Lumberjacks
Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if the company added five workers to it after four days?
- (granite 6329
On the sidewalk, 3 m wide and 8 m long, 2 m³ of mosaic stone (granite cubes) was used. The master of tiles had to pave the sidewalk 2.5 m wide and 65 m long. How much m³ of the stone does it consume?
- Repairman
The repairman has vowed to do repair work at the plant for 25 days. However, work had to be shortened, so he took a helper worker. Together they made all the corrections for the whole day. How long would it take work to help workers?
- Technicians 8382
The order lasted six technicians for 18 days. How long will it take for 1, 2, 3, 4, 5, 6, 8, 10, and 20 technicians to complete?