Sidewalk paving time
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk:
a) 4 workers
b) 5 workers
c) 10 workers
a) 4 workers
b) 5 workers
c) 10 workers
Final Answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk? - Sidewalk
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. In the picture, the sidewalk is shown in gray. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. - In the Gargen
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. How many m² of pavement will be laid with tile - Pool sidewalk tiles
The rectangular pool has dimensions of 10.5m and 8m. There is a 1m wide trail around it. How many m² of tiles are needed to pave the sidewalk? - Granite sidewalk
On the sidewalk, 3 m wide and 8 m long, 2 m³ of mosaic stone (granite cubes) was used. The master of tiles had to pave the sidewalk 2.5 m wide and 65 m long. How much m³ of the stone does it consume? - Workers
Ten workers must pave the road for 22 working days. After four days were spent speeding up work, two more workers were added. a) After how many work days do workers complete the paved road? b) How many working days does a total paved road take? - Pool sidewalk tiles
The rectangular pool has dimensions of 25 meters and 12.5 meters. A 2-meter wide path surrounds the pool. How many square meters of tiles are needed to pave a sidewalk?